(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
| Days to Ship |
|
|---|

1-2-3 Block【2 Pieces Per Package】
NABEYA
[Specifications]
·S50C,Hardening HRC55±5 1-2-3 block.
·Heat treatment: Hardening HRC55±5
| Standard Price: | MYR 1,171.76- |
|---|---|
| Days to Ship: | 4 Day(s) or more |

A-type V Block【2 Pieces Per Package】
NABEYA
The pair difference of the V groove with respect to the two reference planes a and c is MC0.05 and GS/FS0.03.
| Standard Price: | MYR 289.19- |
|---|---|
| Days to Ship: | 4 Day(s) or more |

NABEYA
S55C/quenched HRC45 ±3 steel block (quenched product).
| Standard Price: | MYR 313.04- |
|---|---|
| Days to Ship: | 4 Day(s) or more |

NABEYA
The 4 sides excluding the end faces have undergone finishing grinding. The machining workpiece is stabilized with the use of a parallel block, and precise work can be carried out with increased efficiency since parallelism is guaranteed.
| Standard Price: | MYR 375.90- |
|---|---|
| Days to Ship: | 4 Day(s) or more |

NABEYA
[Features]
Prism block that can be used mainly for locating round workpieces.
| Standard Price: | MYR 657.19- |
|---|---|
| Days to Ship: | 6 Day(s) or more |

B-type V Block【2 Pieces Per Package】
NABEYA
The pair difference of the V groove with respect to the two reference planes a is MC0.05 and GS/FS0.03.
| Standard Price: | MYR 232.83- |
|---|---|
| Days to Ship: | 4 Day(s) or more |
| Standard Price: | MYR 6,717.34- |
|---|---|
| Days to Ship: | 10 Day(s) or more |
| Standard Price: | MYR 6,748.46- |
|---|---|
| Days to Ship: | 6 Day(s) or more |
| Standard Price: | MYR 117.64- |
|---|---|
| Days to Ship: | 8 Day(s) or more |

NABEYA
[Features]
· As there is less cutting edge interference, it is optimal for clamping 5-axis processing machines and multi-function machines.
· A small-diameter upper clamp bolt draws in the workpiece, enabling powerful clamping.
· It is possible to position the receiving height of the workpiece with the flange.
· For DRC-FP, positioning and clamping can be performed simultaneously by drilling two reference holes that match the pin intersection in pre-machining.
| Standard Price: | MYR 524.39- |
|---|---|
| Days to Ship: | 10 Day(s) or more |
| Brand |
|---|
| Product Series |
| CAD |
| Days to Ship |
| Brand | NABEYA | NABEYA | NABEYA | NABEYA | NABEYA | NABEYA | NEW STRONG | NEW STRONG | SUPER TOOL | NABEYA |
|---|---|---|---|---|---|---|---|---|---|---|
| Product Series | ||||||||||
| CAD |
|
|
|
|
|
|
| |||
| Days to Ship | 4 Day(s) or more | 4 Day(s) or more | 4 Day(s) or more | 4 Day(s) or more | 6 Day(s) or more | 4 Day(s) or more | 10 Day(s) or more | 6 Day(s) or more | 8 Day(s) or more | 10 Day(s) or more |
Loading...
How can we improve?
How can we improve?
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Customer Privacy Policy
Thank you for your cooperation.
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Please use the inquiry form.
Customer Privacy Policy