(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
NAGOYA, screw-in fitting / threaded type flange, stainless steel screw-in pipe fitting, tee.
Japanese Only
| Part Number |
|---|
| T6A |
| T8A |
| T10A |
| T15A |
| T20A |
| T25A |
| T32A |
| T40A |
| T50A |
| T65A |
| T80A |
| T100A |
| Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Days to Ship | Nominal of Thread M1 |
|---|---|---|---|---|---|
MYR 50.68 | 1 Piece(s) | 7 Day(s) or more | 1/8B(6A) | ||
MYR 50.68 | 1 Piece(s) | 7 Day(s) or more | 1/4B(8A) | ||
MYR 53.73 | 1 Piece(s) | 7 Day(s) or more | 3/8B(10A) | ||
MYR 56.42 | 1 Piece(s) | 7 Day(s) or more | 1/2B(15A) | ||
MYR 73.30 | 1 Piece(s) | 7 Day(s) or more | 3/4B(20A) | ||
MYR 96.94 | 1 Piece(s) | 7 Day(s) or more | 1B(25A) | ||
MYR 135.09 | 1 Piece(s) | 7 Day(s) or more | 1 1/4B(32A) | ||
MYR 153.65 | 1 Piece(s) | 7 Day(s) or more | 1 1/2B(40A) | ||
MYR 235.02 | 1 Piece(s) | 7 Day(s) or more | 2B(50A) | ||
MYR 513.88 | 1 Piece(s) | 10 Day(s) or more | 2 1/2B(65A) | ||
MYR 689.44 | 1 Piece(s) | 10 Day(s) or more | 3B(80A) | ||
MYR 1,334.27 | 1 Piece(s) | 10 Day(s) or more | 4B(100A) |
Loading...
| Connecting Shape | Tee | Connection Type | Screw⇔Screw Same Diameter・Different Type | Material | SCS13A(SUS304) |
|---|---|---|---|---|---|
| Connection Thread Type M1 | Rc | Applicable Fluid | Water / Air / Steam / Gas / Oil | Type | Fitting |
| Max. Operating Pressure(MPa) | 2 | Surface Treatment | No | Divisions of Max. Operating Pressure | 2.0Mpa or Less |
| Interior Resin Lining | No | Details of non-shock maximum working pressure(Temperature:-20~40℃)(MPa) | 2 | Details of non-shock maximum working pressure(Temperature:100℃)(MPa) | 1.65 |
| Details of non-shock maximum working pressure(Temperature:150℃)(MPa) | 1.5 | Details of non-shock maximum working pressure(Temperature:200℃)(MPa) | 1.4 | Details of non-shock maximum working pressure(Temperature:220℃)(MPa) | 1.35 |


NAGOYA
Standard Price : MYR 20.08-
Days to Ship : 7 Day(s) or more

ON INDUSTRIES
Standard Price : MYR 31.34-
Days to Ship : 4 Day(s) or more

ONDASEISAKUSYO
Standard Price : MYR 26.73-
Days to Ship : 5 Day(s) or more

NAGOYA
Standard Price : MYR 64.86-
Days to Ship : 7 Day(s) or more

NAGOYA
Standard Price : MYR 40.89-
Days to Ship : 4 Day(s) or more
![Stainless Steel Screw-In Pipe Fitting, Tee [T]](http://my.misumi-ec.com/linked/material/mech/MIE1/PHOTO/221000768512_001.jpg?$product_recommend_b$)
MIETECHNO
Standard Price : MYR 27.71-
Days to Ship : 5 Day(s) or more

NAGOYA
Standard Price : MYR 57.10-
Days to Ship : 4 Day(s) or more

NAGOYA
Standard Price : MYR 32.45-
Days to Ship : 7 Day(s) or more

CK_KINZOKU
Standard Price : MYR 23.21-
Days to Ship : 7 Day(s) or more


How can we improve?
How can we improve?
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Customer Privacy Policy
Thank you for your cooperation.
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Please use the inquiry form.
Customer Privacy Policy