(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • [Notice] Japan & China Golden Week holidays will start from 29 April to 6 May 2026. Kindly expect longer response from suppliers and possible delivery delay due to high volume of shipments after holiday. Early order placement is recommended. More details
  • [Announcement] MISUMI Malaysia website new user interface. Clearer navigation, easy product search and more. Explore now! May contact us at (60) 3 7890 6399 for any inquiries.

Current Feedthrough, Lead-in Terminals(Type of Related Component:Coaxial Coupling Parts)

Days to Ship
  • All
  • 4 Day(s) or Less
  • 9 Day(s) or Less
  • 10 Day(s) or Less
  • 13 Day(s) or Less
  • 16 Day(s) or Less
  • 17 Day(s) or Less
  • 18 Day(s) or Less
  • 21 Day(s) or Less
  • 22 Day(s) or Less
  • 23 Day(s) or Less
  1. 1
Brand
Product Series
Days to Ship
Type
Number of Terminals
Voltage (AC)(kV)
Voltage (DC)(kV)
Current (MAX)(A)
Electrode Material
Flange Standard
Flange Material
Flange Size (Nominal)
Operating Temperature Range (MIN ~ MAX)(℃)
Type of Related Component

    Connecting components for coaxial atmosphere side plug

      Coaxial Connection Component, PEEK Cable

      Brand

      COSMOTEC

      COSMOTEC

      Product Series

      Connecting components for coaxial atmosphere side plug

      Coaxial Connection Component, PEEK Cable

      Days to Ship 4 Day(s) or more 4 Day(s) or more
      TypeRelated ComponentsRelated Components
      Number of Terminals--
      Voltage (AC)(kV)--
      Voltage (DC)(kV)--
      Current (MAX)(A)--
      Electrode Material--
      Flange Standard--
      Flange Material--
      Flange Size (Nominal)--
      Operating Temperature Range (MIN ~ MAX)(℃)--
      Type of Related ComponentCoaxial Coupling PartsCoaxial Coupling Parts

      Loading...

      1. 1

      Related Categories to Current Feedthrough, Lead-in Terminals