(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

















Manifold Blocks - Hydraulic / Pneumatic - Lateral Through Hole, Vertical Semi-Through Hole
MISUMI
This is a block manifold for hydraulic pressure and air.
| Standard Price: | MYR 71.64- |
|---|---|
| Days to Ship: | 4 Day(s) or more |

Manifold Blocks - Hydraulic - Lateral Through Hole, Vertical Semi-Through Hole
MISUMI
This is a block manifold for hydraulic and water pressure. G(PF) thread processing can also be specified.
| Days to Ship: | 6 Day(s) or more |
|---|
![[Clean & Pack]Manifold Block - Pneumatic, Lateral Through Hole, Vertical Semi-Through Hole Type](http://my.misumi-ec.com/linked/material/mech/MSM1/PHOTO/110311007099_001.jpg?$product_view_b$)
[Clean & Pack]Manifold Block - Pneumatic, Lateral Through Hole, Vertical Semi-Through Hole Type
MISUMI
| ·Degreasing (Anti-rust single packing) | : Part Number SL-□□ |
| ·Precision cleaning (Degassing double packing) | : Part Number SH-□□ |
| ·Electrolytic polishing + precision cleaning (Degassing double packing) | : Part Number SHD-□□ |
| Product Part Number | Cleaning Method | Packaging Type | Effects Compared to Uncleaned Product | Environment (Standard) | Process |
| SL-□□ | Degreasing | Anti-rust packing | Oil removal | General environment | Regular assembly process |
| Post battery assembly process | |||||
| SH-□□ | Precision cleaning | Degassing double packing | Oil removal Dust removal | Clean environment (Class 10 to 1,000) | Battery assembly process |
| LCD-related post assembly process | |||||
| In-vehicle camera assembly process | |||||
| SHD-□□ | Electrolytic polishing + precision cleaning | Degassing double packing | Oil removal Dust removal Outgas reduction | Vacuum environment Clean environment (Class 10 to 1,000) | Pre-semiconductor process |
| Liquid crystal deposition process | |||||
| Pre-OLED process |
| Days to Ship: | 6 Day(s) or more |
|---|
![[Clean & Pack]Terminal Block - Pneumatic, Block Square 10 × 15, Space Saving](http://my.misumi-ec.com/linked/material/mech/MSM1/PHOTO/110311007999_001.jpg?$product_view_b$)
[Clean & Pack]Terminal Block - Pneumatic, Block Square 10 × 15, Space Saving
MISUMI
| ·Degreasing (Anti-rust single packing) | : Part Number SL-□□ |
| ·Precision cleaning (Degassing double packing) | : Part Number SH-□□ |
| ·Electrolytic polishing + precision cleaning (Degassing double packing) | : Part Number SHD-□□ |
| Product Part Number | Cleaning Method | Packaging Type | Effects Compared to Uncleaned Product | Environment (Standard) | Process |
| SL-□□ | Degreasing | Anti-rust packing | Oil removal | General environment | Regular assembly process |
| Post battery assembly process | |||||
| SH-□□ | Precision cleaning | Degassing double packing | Oil removal Dust removal | Clean environment (Class 10 to 1,000) | Battery assembly process |
| LCD-related post assembly process | |||||
| In-vehicle camera assembly process | |||||
| SHD-□□ | Electrolytic polishing + precision cleaning | Degassing double packing | Oil removal Dust removal Outgas reduction | Vacuum environment Clean environment (Class 10 to 1,000) | Pre-semiconductor process |
| Liquid crystal deposition process | |||||
| Pre-OLED process |
| Days to Ship: | 6 Day(s) or more |
|---|

Manifold Blocks - Pneumatic - Lateral Through Hole, Vertical Semi-Through Hole
MISUMI
This is a block manifold for air. G(PF) thread processing can also be specified.
| Days to Ship: | 6 Day(s) or more |
|---|

Manifold Blocks - Pneumatic - Space Saving Type
MISUMI
[Features]·A space saving type manifold. [Material]·Aluminum alloy.
| Days to Ship: | 6 Day(s) or more |
|---|
![[Clean & Pack]Manifold Block - Pneumatic, Lateral Through Hole, Vertical Semi-Through Hole](http://my.misumi-ec.com/linked/material/mech/MSM1/PHOTO/110311008089_001.jpg?$product_view_b$)
[Clean & Pack]Manifold Block - Pneumatic, Lateral Through Hole, Vertical Semi-Through Hole
MISUMI
| ·Degreasing (Anti-rust single packing) | : Part Number SL-□□ |
| ·Precision cleaning (Degassing double packing) | : Part Number SH-□□ |
| ·Electrolytic polishing + precision cleaning (Degassing double packing) | : Part Number SHD-□□ |
| Product Part Number | Cleaning Method | Packaging Type | Effects Compared to Uncleaned Product | Environment (Standard) | Process |
| SL-□□ | Degreasing | Anti-rust packing | Oil removal | General environment | Regular assembly process |
| Post battery assembly process | |||||
| SH-□□ | Precision cleaning | Degassing double packing | Oil removal Dust removal | Clean environment (Class 10 to 1,000) | Battery assembly process |
| LCD-related post assembly process | |||||
| In-vehicle camera assembly process | |||||
| SHD-□□ | Electrolytic polishing + precision cleaning | Degassing double packing | Oil removal Dust removal Outgas reduction | Vacuum environment Clean environment (Class 10 to 1,000) | Pre-semiconductor process |
| Liquid crystal deposition process | |||||
| Pre-OLED process |
| Standard Price: | MYR 158.77- |
|---|---|
| Days to Ship: | 6 Day(s) or more |
| Brand |
|---|
| Product Series |
| CAD |
| Days to Ship |
| Shape |
| Environmentally friendly |
| Material |
| Characteristics/Applications |
| Surface Treatment |
| Cleaning Method |
| Brand | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI |
|---|---|---|---|---|---|---|---|
| Product Series | Manifold Blocks - Hydraulic / Pneumatic - Lateral Through Hole, Vertical Semi-Through Hole | Manifold Blocks - Hydraulic - Lateral Through Hole, Vertical Semi-Through Hole | [Clean & Pack]Manifold Block - Pneumatic, Lateral Through Hole, Vertical Semi-Through Hole Type | [Clean & Pack]Terminal Block - Pneumatic, Block Square 10 × 15, Space Saving | Manifold Blocks - Pneumatic - Lateral Through Hole, Vertical Semi-Through Hole | [Clean & Pack]Manifold Block - Pneumatic, Lateral Through Hole, Vertical Semi-Through Hole | |
| CAD |
|
|
|
|
|
|
|
| Days to Ship | 4 Day(s) or more | 6 Day(s) or more | 6 Day(s) or more | 6 Day(s) or more | 6 Day(s) or more | 6 Day(s) or more | 6 Day(s) or more |
| Shape | Lateral Through Hole, Vertical Semi-Through Hole | Lateral Through Hole, Vertical Semi-Through Hole | Lateral Through Hole, Vertical Semi-Through Hole | Lateral Through Hole, Vertical Semi-Through Hole | Lateral Through Hole, Vertical Semi-Through Hole | Lateral Through Hole, Vertical Semi-Through Hole | Lateral Through Hole, Vertical Semi-Through Hole |
| Environmentally friendly | - | - | RoHS Compliant (10 Substances) | RoHS Compliant (10 Substances) | - | - | RoHS Compliant (10 Substances) |
| Material | Aluminum Alloy / Steel for General Structure | SUS304 / Brass / SS400 Equivalent | Aluminum Alloy | Aluminum Alloy | Aluminum Alloy | Aluminum Alloy | Aluminum Alloy |
| Characteristics/Applications | - | - | Clean Washed | Clean Washed | - | - | Clean Washed |
| Surface Treatment | Not Provided / Trivalent Chromate | Not Provided / Trivalent Chromate / Electroless Nickel Plating | Not Provided / Clear Anodize | Not Provided / Clear Anodize | Not Provided / Clear Anodize | Not Provided / Clear Anodize | Not Provided / Clear Anodize |
| Cleaning Method | - | - | Degreasing / Precision Cleaning / Electrolytic Polishing + Precision Cleaning | Degreasing / Precision Cleaning / Electrolytic Polishing + Precision Cleaning | - | - | Degreasing / Precision Cleaning / Electrolytic Polishing + Precision Cleaning |
Loading...
How can we improve?
How can we improve?
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Customer Privacy Policy
Thank you for your cooperation.
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Please use the inquiry form.
Customer Privacy Policy