(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

















Manifold Blocks - Hydraulic / Pneumatic - Lateral and Vertical Through Hole
MISUMI
This is a block manifold for hydraulic and water pressure. G(PF) thread processing can also be specified.
| Days to Ship: | 6 Day(s) or more |
|---|

Manifold Blocks - Hydraulic / Pneumatic - Lateral Through Hole, T-Shaped Hole
MISUMI
This is a block manifold for hydraulic and water pressure. G(PF) thread processing can also be specified.
| Days to Ship: | 6 Day(s) or more |
|---|

Terminal Blocks - Hydraulic - Vertical Through Hole
MISUMI
This is a block manifold for hydraulic and water pressure. G(PF) thread processing can also be specified.
| Days to Ship: | 6 Day(s) or more |
|---|

Block Terminal for Hydraulics/Hydraulics - L-Shaped Hole Type - Fixed Pitch
MISUMI
This is a block manifold for hydraulic and water pressure. G(PF) thread processing can also be specified.
| Days to Ship: | 6 Day(s) or more |
|---|

Manifold Blocks - Hydraulic - Lateral Through Hole, L-Shaped Hole
MISUMI
This is a block manifold for hydraulic and water pressure. G(PF) thread processing can also be specified.
| Days to Ship: | 6 Day(s) or more |
|---|

Manifold Blocks - Hydraulic - Lateral Through Hole, Upper Hole
MISUMI
This is a block manifold for hydraulic and water pressure. G(PF) thread processing can also be specified.
| Days to Ship: | 6 Day(s) or more |
|---|
![[Clean & Pack] Manifold Block - Hydraulic, Lateral Through Hole, Upper Hole](http://content.misumi-ec.com/image/upload/t_product_view_b/v1/p/jp/product/series/110310637379/110310637379_001_20230911105917.jpg?$product_view_b$)
[Clean & Pack] Manifold Block - Hydraulic, Lateral Through Hole, Upper Hole
MISUMI
| ·Degreasing (Anti-rust single packing) | : Part Number SL-□□ |
| ·Precision cleaning (Degassing double packing) | : Part Number SH-□□ |
| ·Electrolytic polishing + precision cleaning (Degassing double packing) | : Part Number SHD-□□ |
| Product Part Number | Cleaning Method | Packaging Type | Effects Compared to Uncleaned Product | Environment (Standard) | Process |
| SL-□□ | Degreasing | Anti-rust packing | Oil removal | General environment | Regular assembly process |
| Post battery assembly process | |||||
| SH-□□ | Precision cleaning | Degassing double packing | Oil removal Dust removal | Clean environment (Class 10 to 1,000) | Battery assembly process |
| LCD-related post assembly process | |||||
| In-vehicle camera assembly process | |||||
| SHD-□□ | Electrolytic polishing + precision cleaning | Degassing double packing | Oil removal Dust removal Outgas reduction | Vacuum environment Clean environment (Class 10 to 1,000) | Pre-semiconductor process |
| Liquid crystal deposition process | |||||
| Pre-OLED process |
| Days to Ship: | 6 Day(s) or more |
|---|
![[Clean & Pack]Manifold Block - Hydraulic, Lateral Through Hole, L-Shaped Hole](http://content.misumi-ec.com/image/upload/t_product_view_b/v1/p/jp/product/series/110310637469/110310637469_001_20230911105917.jpg?$product_view_b$)
[Clean & Pack]Manifold Block - Hydraulic, Lateral Through Hole, L-Shaped Hole
MISUMI
| ·Degreasing (Anti-rust single packing) | : Part Number SL-□□ |
| ·Precision cleaning (Degassing double packing) | : Part Number SH-□□ |
| ·Electrolytic polishing + precision cleaning (Degassing double packing) | : Part Number SHD-□□ |
| Product Part Number | Cleaning Method | Packaging Type | Effects Compared to Uncleaned Product | Environment (Standard) | Process |
| SL-□□ | Degreasing | Anti-rust packing | Oil removal | General environment | Regular assembly process |
| Post battery assembly process | |||||
| SH-□□ | Precision cleaning | Degassing double packing | Oil removal Dust removal | Clean environment (Class 10 to 1,000) | Battery assembly process |
| LCD-related post assembly process | |||||
| In-vehicle camera assembly process | |||||
| SHD-□□ | Electrolytic polishing + precision cleaning | Degassing double packing | Oil removal Dust removal Outgas reduction | Vacuum environment Clean environment (Class 10 to 1,000) | Pre-semiconductor process |
| Liquid crystal deposition process | |||||
| Pre-OLED process |
| Days to Ship: | 6 Day(s) or more |
|---|
![[Clean & Pack]Terminal Block - Hydraulic, L-Shaped Hole, Pitch Standard](http://content.misumi-ec.com/image/upload/t_product_view_b/v1/p/jp/product/series/110310637649/110310637649_001_20230911105917.jpg?$product_view_b$)
[Clean & Pack]Terminal Block - Hydraulic, L-Shaped Hole, Pitch Standard
MISUMI
| ·Degreasing (Anti-rust single packing) | : Part Number SL-□□ |
| ·Precision cleaning (Degassing double packing) | : Part Number SH-□□ |
| ·Electrolytic polishing + precision cleaning (Degassing double packing) | : Part Number SHD-□□ |
| Product Part Number | Cleaning Method | Packaging Type | Effects Compared to Uncleaned Product | Environment (Standard) | Process |
| SL-□□ | Degreasing | Anti-rust packing | Oil removal | General environment | Regular assembly process |
| Post battery assembly process | |||||
| SH-□□ | Precision cleaning | Degassing double packing | Oil removal Dust removal | Clean environment (Class 10 to 1,000) | Battery assembly process |
| LCD-related post assembly process | |||||
| In-vehicle camera assembly process | |||||
| SHD-□□ | Electrolytic polishing + precision cleaning | Degassing double packing | Oil removal Dust removal Outgas reduction | Vacuum environment Clean environment (Class 10 to 1,000) | Pre-semiconductor process |
| Liquid crystal deposition process | |||||
| Pre-OLED process |
| Days to Ship: | 6 Day(s) or more |
|---|
![[Clean & Pack] Terminal Block - Hydraulic, Vertical Through Hole](http://content.misumi-ec.com/image/upload/t_product_view_b/v1/p/jp/product/series/110310637739/110310637739_001_20230911105917.jpg?$product_view_b$)
[Clean & Pack] Terminal Block - Hydraulic, Vertical Through Hole
MISUMI
| ·Degreasing (Anti-rust single packing) | : Part Number SL-□□ |
| ·Precision cleaning (Degassing double packing) | : Part Number SH-□□ |
| ·Electrolytic polishing + precision cleaning (Degassing double packing) | : Part Number SHD-□□ |
| Product Part Number | Cleaning Method | Packaging Type | Effects Compared to Uncleaned Product | Environment (Standard) | Process |
| SL-□□ | Degreasing | Anti-rust packing | Oil removal | General environment | Regular assembly process |
| Post battery assembly process | |||||
| SH-□□ | Precision cleaning | Degassing double packing | Oil removal Dust removal | Clean environment (Class 10 to 1,000) | Battery assembly process |
| LCD-related post assembly process | |||||
| In-vehicle camera assembly process | |||||
| SHD-□□ | Electrolytic polishing + precision cleaning | Degassing double packing | Oil removal Dust removal Outgas reduction | Vacuum environment Clean environment (Class 10 to 1,000) | Pre-semiconductor process |
| Liquid crystal deposition process | |||||
| Pre-OLED process |
| Days to Ship: | 6 Day(s) or more |
|---|
| Brand |
|---|
| Product Series |
| CAD |
| Days to Ship |
| Shape |
| Environmentally friendly |
| Material |
| Characteristics/Applications |
| Surface Treatment |
| Cleaning Method |
| Brand | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI | MISUMI |
|---|---|---|---|---|---|---|---|---|---|---|
| Product Series | Manifold Blocks - Hydraulic / Pneumatic - Lateral and Vertical Through Hole | Manifold Blocks - Hydraulic / Pneumatic - Lateral Through Hole, T-Shaped Hole | Block Terminal for Hydraulics/Hydraulics - L-Shaped Hole Type - Fixed Pitch | Manifold Blocks - Hydraulic - Lateral Through Hole, L-Shaped Hole | Manifold Blocks - Hydraulic - Lateral Through Hole, Upper Hole | [Clean & Pack] Manifold Block - Hydraulic, Lateral Through Hole, Upper Hole | [Clean & Pack]Manifold Block - Hydraulic, Lateral Through Hole, L-Shaped Hole | [Clean & Pack]Terminal Block - Hydraulic, L-Shaped Hole, Pitch Standard | [Clean & Pack] Terminal Block - Hydraulic, Vertical Through Hole | |
| CAD |
|
|
|
|
|
|
|
|
|
|
| Days to Ship | 6 Day(s) or more | 6 Day(s) or more | 6 Day(s) or more | 6 Day(s) or more | 6 Day(s) or more | 6 Day(s) or more | 6 Day(s) or more | 6 Day(s) or more | 6 Day(s) or more | 6 Day(s) or more |
| Shape | Lateral Through Hole, Vertical Through Hole | Lateral Through Hole, T-Shaped Hole | Vertical Through Hole | Vertical Semi-Through Hole, Upper Hole | Lateral Through Hole, L-Shaped Hole | Lateral Through Hole, Upper Hole | Lateral Through Hole, Upper Hole | Lateral Through Hole, L-Shaped Hole | Vertical Semi-Through Hole, Upper Hole | Vertical Through Hole |
| Environmentally friendly | - | - | - | - | - | - | RoHS Compliant (10 Substances) | RoHS Compliant (10 Substances) | RoHS Compliant (10 Substances) | RoHS Compliant (10 Substances) |
| Material | SUS316 | SUS316 | SUS316 | SUS316 | SUS316 | SUS316 | SUS316 | SUS316 | SUS316 | SUS316 |
| Characteristics/Applications | - | - | - | - | - | - | Clean Washed | Clean Washed | Clean Washed | Clean Washed |
| Surface Treatment | Not Provided | Not Provided | Not Provided | Not Provided | Not Provided | Not Provided | Not Provided | Not Provided | Not Provided | Not Provided |
| Cleaning Method | - | - | - | - | - | - | Degreasing / Precision Cleaning / Electrolytic Polishing + Precision Cleaning | Degreasing / Precision Cleaning / Electrolytic Polishing + Precision Cleaning | Degreasing / Precision Cleaning / Electrolytic Polishing + Precision Cleaning | Degreasing / Precision Cleaning / Electrolytic Polishing + Precision Cleaning |
Loading...
How can we improve?
How can we improve?
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Customer Privacy Policy
Thank you for your cooperation.
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Please use the inquiry form.
Customer Privacy Policy