(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
| Days to Ship |
|
|---|

Pipe Frame Metal Joint Component/Constituent Part, SJ-B/SJ-BN
SPACIO
It is a single item of the metal joint components for pipe frame. An M6 bolt. [Surface Treatment]·Trivalent black chromate / trivalent chromate
| Standard Price: | MYR 1.66- |
|---|---|
| Days to Ship: | 5 Day(s) or more |

Movable Shelf Parts For Pipe Frames, Gas Damper L174
SPACIO
·Genuine SPACIO product. [Fixing Method]Screw rigid.
| Standard Price: | MYR 225.31 |
|---|---|
| Days to Ship: | 7 Day(s) or more |

Movable Shelf Parts for Pipe Frame
SPACIO
[Features]
· It is a part for moving shelf boards of hand trucks made from pipe frames.
| Standard Price: | MYR 128.84 |
|---|---|
| Days to Ship: | 5 Day(s) or more |

Pipe Frame Metal Joint Component/Constituent Part, SJ-N/SJ-NN
SPACIO
It is a single item of the metal joint components for pipe frame. An M6 nut.
| Standard Price: | MYR 2.30- |
|---|---|
| Days to Ship: | 5 Day(s) or more |

Pipe Frame Hand Truck Connection Element, JB-702B
SPACIO
Parts for connecting platform trucks, made of pipe frames.
| Standard Price: | MYR 196.10 |
|---|---|
| Days to Ship: | 5 Day(s) or more |

Pipe Frame Hand Truck Connecting Element, JB-702C
SPACIO
Parts for connecting platform trucks, made of pipe frames.
| Standard Price: | MYR 428.45 |
|---|---|
| Days to Ship: | 5 Day(s) or more |

Pipe Frame Hand Truck Connecting Element, JB-712A
SPACIO
Parts for connecting platform trucks, made of pipe frames.
| Standard Price: | MYR 88.72 |
|---|---|
| Days to Ship: | 7 Day(s) or more |

Pipe Frame Hand Truck Connecting Element, JB-712B
SPACIO
Parts for connecting platform trucks, made of pipe frames.
| Standard Price: | MYR 78.60 |
|---|---|
| Days to Ship: | 7 Day(s) or more |

Pipe Frame Hand Truck Connection Element, JB-712M
SPACIO
Parts for connecting platform trucks, made of pipe frames.
| Standard Price: | MYR 103.16 |
|---|---|
| Days to Ship: | 9 Day(s) or more |

Pipe Frame Hand Truck Connecting Element, JB-712T1/JB-712T2
SPACIO
Parts for connecting platform trucks, made of pipe frames.
| Standard Price: | MYR 53.77- |
|---|---|
| Days to Ship: | 7 Day(s) or more |

Pipe Frame Hand Truck Connection Part, JB-712Y1/JB-712Y2
SPACIO
* When directly mounting on ø27.5 pipe, please use "PJ-203B." (Sold separately)
[Features]
· Part for connecting hand trucks made of pipe frames
| Standard Price: | MYR 53.77- |
|---|---|
| Days to Ship: | 7 Day(s) or more |

Pipe Frame Fixing Connecting Element, JB-303【20 Pieces Per Package】
SPACIO
[Applications]·It can be used while mounting various parts on the pipe frame
| Standard Price: | MYR 52.25 |
|---|---|
| Days to Ship: | 7 Day(s) or more |

Pipe Frame Fixing Connecting Element, JB-AP
SPACIO
Anchor plate. Material: iron, trivalent chromate treatment. Fixing method: screw rigid.
| Standard Price: | MYR 29.72- |
|---|---|
| Days to Ship: | 5 Day(s) or more |

Pipe Frame Opening and Closing Element, JB-103
SPACIO
Can be used when making doors, etc., with pipe frame. [Materials]Steel "Surface treatment" trivalent chromate
| Standard Price: | MYR 121.59 |
|---|---|
| Days to Ship: | 11 Day(s) |

Pipe Frame Opening and Closing Element, JB-165
SPACIO
Can be used when making doors, etc., with pipe frame. Compatible pipe diameter: ⌀27.5
| Standard Price: | MYR 46.30 |
|---|---|
| Days to Ship: | 5 Day(s) or more |

Opening And Closing Component For Pipe Frames, JB-166
SPACIO
Lock fittings used for opening and closing. Screw-rigid metal joint.
| Standard Price: | MYR 33.47 |
|---|---|
| Days to Ship: | 10 Day(s) or more |

Opening And Closing Component For Pipe Frames, JB-167
SPACIO
Lock fittings used for opening and closing. Screw-rigid bracket holder.
| Standard Price: | MYR 100.22 |
|---|---|
| Days to Ship: | 10 Day(s) or more |

Lift Carrying Part For Pipe Frames, JB-707
SPACIO
A lift guide for pipe frames. [Materials]Steel. "Surface treatment" trivalent chromate
| Standard Price: | MYR 204.30 |
|---|---|
| Days to Ship: | 11 Day(s) |
| Brand |
|---|
| Product Series |
| Days to Ship |
| Mounting Method |
| Surface Treatment |
| Type 1 |
| Joint Type |
| Material |
| Applicable Pipe Dia.(φ),(□) |
| Intermediate Joint Type |
| Accessory Type |
| Operating Environment |
| Brand | SPACIO | SPACIO | SPACIO | SPACIO | SPACIO | SPACIO | SPACIO | SPACIO | SPACIO | SPACIO | SPACIO | SPACIO | SPACIO | SPACIO | SPACIO | SPACIO | SPACIO | SPACIO |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Product Series | Pipe Frame Metal Joint Component/Constituent Part, SJ-B/SJ-BN | Pipe Frame Metal Joint Component/Constituent Part, SJ-N/SJ-NN | Pipe Frame Fixing Connecting Element, JB-303【20 Pieces Per Package】 | |||||||||||||||
| Days to Ship | 5 Day(s) or more | 7 Day(s) or more | 5 Day(s) or more | 5 Day(s) or more | 5 Day(s) or more | 5 Day(s) or more | 7 Day(s) or more | 7 Day(s) or more | 9 Day(s) or more | 7 Day(s) or more | 7 Day(s) or more | 7 Day(s) or more | 5 Day(s) or more | 11 Day(s) | 5 Day(s) or more | 10 Day(s) or more | 10 Day(s) or more | 11 Day(s) |
| Mounting Method | Screw-Fixed Type | Screw-Fixed Type | Screw-Fixed Type | Screw-Fixed Type | Screw-Fixed Type | Screw-Fixed Type | Screw-Fixed Type | Screw-Fixed Type | Screw-Fixed Type | Screw-Fixed Type | Screw-Fixed Type | Screw-Fixed Type | Screw-Fixed Type | Screw-Fixed Type | Screw-Fixed Type | Screw-Fixed Type | Screw-Fixed Type | Screw-Fixed Type |
| Surface Treatment | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Trivalent Chromate | - | Trivalent Chromate |
| Type 1 | Accessories | Accessories | Accessories | Accessories | Accessories | Accessories | Accessories | Accessories | Accessories | Accessories | Accessories | Accessories | Accessories | Accessories | Accessories | Metal Joint | Accessories | Accessories |
| Joint Type | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Center | - | - |
| Material | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Steel | - | Steel |
| Applicable Pipe Dia.(φ),(□) | - | - | - | - | - | - | - | - | - | - | - | 27.5 | - | 27.5 | 27.5 | 27.5 | 27.5 | 27.5 |
| Intermediate Joint Type | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Through | - | - |
| Accessory Type | Screw, Nut | Absorber | Trailering Components | Screw, Nut | Trailering Components | Trailering Components | Trailering Components | Trailering Components | Trailering Components | Trailering Components | Trailering Components | Hook, Hanger | Anchor | Cap (End) | Hook, Hanger | - | Bracket, Holder | Locating and Guide Components |
| Operating Environment | Standard | Standard | Standard | Standard | Standard | Standard | Standard | Standard | Standard | Standard | Standard | Standard | Standard | Standard | Standard | Standard | Standard | Standard |
Loading...
How can we improve?
How can we improve?
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Customer Privacy Policy
Thank you for your cooperation.
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Please use the inquiry form.
Customer Privacy Policy