(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
| Days to Ship |
|
|---|
| Standard Price: | MYR 57.09 |
|---|---|
| Days to Ship: | 8 Day(s) |

M4 Series Intermediate Bracket Fastener Set
NIC AUTOTEC
Structural elements of factory automation equipment [Mounting Frame] M4 type [Nut Material] Selectable from steel/stainless steel, etc.
| Standard Price: | MYR 34.35- |
|---|---|
| Days to Ship: | 4 Day(s) or more |

NIC AUTOTEC
·Structural element of factory automation equipment. [Materials]ABS resin "ABS," polypropylene [PP]
| Standard Price: | MYR 43.41 |
|---|---|
| Days to Ship: | 4 Day(s) or more |

NIC AUTOTEC
[Features]
・ Structural element for factory automation equipment
・ A square nut for M6 is inserted inside
・ By cutting and processing the bracket frame (special frame), it is possible to manufacture nonstandard brackets
・ The frame can be easily connected only with brackets and bolts without using a special construction method such as welding
| Standard Price: | MYR 18.25 |
|---|---|
| Days to Ship: | 4 Day(s) or more |

NIC AUTOTEC
Structural material for factory automation equipment
| Standard Price: | MYR 20.08 |
|---|---|
| Days to Ship: | 4 Day(s) or more |

Line 5/6/8 Clamp Multi-Block PA MBC
IMAO
It is dedicated for Line 5/6/8 profile. The panel can be sandwiched and fixed. [Material] Polyamide (glass fiber reinforced).
| Standard Price: | MYR 33.11 |
|---|---|
| Days to Ship: | 10 Day(s) or more |
| Standard Price: | MYR 36.70 |
|---|---|
| Days to Ship: | 4 Day(s) or more |

NIC AUTOTEC
Structural material for factory automation equipment
| Standard Price: | MYR 34.88 |
|---|---|
| Days to Ship: | 4 Day(s) or more |
| Brand |
|---|
| Product Series |
| CAD |
| Days to Ship |
| Type |
| Middle Bracket Shape |
| Material |
| Cleaning Method |
| Brand | IMAO | NIC AUTOTEC | NIC AUTOTEC | NIC AUTOTEC | NIC AUTOTEC | IMAO | NIC AUTOTEC | NIC AUTOTEC |
|---|---|---|---|---|---|---|---|---|
| Product Series | ||||||||
| CAD |
|
|
|
|
|
|
|
|
| Days to Ship | 8 Day(s) | 4 Day(s) or more | 4 Day(s) or more | 4 Day(s) or more | 4 Day(s) or more | 10 Day(s) or more | 4 Day(s) or more | 4 Day(s) or more |
| Type | Middle Bracket | Middle Bracket | Middle Bracket | Middle Bracket | Middle Bracket | Middle Bracket | Middle Bracket | Middle Bracket |
| Middle Bracket Shape | Block type | L Shaped | L Shaped | Block type | Block type | Block type | Block type | L Shaped |
| Material | Resin | Resin | Resin | Resin | Resin | Resin | Aluminum | Aluminum |
| Cleaning Method | - | - | - | - | - | - | - | - |
Loading...
How can we improve?
How can we improve?
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Customer Privacy Policy
Thank you for your cooperation.
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Please use the inquiry form.
Customer Privacy Policy