Spiral tap with short thread length effective for deep screw tapping of 2.5 times nominal diameter or more.
[Features]
· Low frictional resistance and good supply of cutting oil are effective for deep thread machining to 2.5 times the nominal diameter or more.
· Oxide treatment (OX treatment) applied to prevent welding.
[Applications]
· Optimal for deep thread machining to 2.5 times the nominal diameter or more.
Japanese Only
| Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Days to Ship | Nominal | work material | Pitch, Number of Threading (mm) | Overall Length (L) (mm) | Class | Thread Length (mm) | Length under neck (mm) | Shank diameter (Ds) (mm) | Shank square width (K) (mm) | Shank square part length (mm) | Number of Grooves | Shape | Surface Treatment | Torsional Angle |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
MYR 88.15 | 1 Piece(s) | 10 Day(s) | M2 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 0.4 | 42 | P1 | 4 | 12 | 3 | 2.5 | 5 | 2 | d | Oxidation treatment | 45° | ||
MYR 101.20 | 1 Piece(s) | 7 Day(s) or more | M2.3 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 0.4 | 42 | P1 | 4 | 12 | 3 | 2.5 | 5 | 2 | d | Oxidation treatment | 45° | ||
MYR 85.59 | 1 Piece(s) | 7 Day(s) or more | M2.5 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 0.45 | 46 | P1 | 4 | 14 | 3 | 2.5 | 5 | 2 | d | Oxidation treatment | 45° | ||
MYR 78.49 | 1 Piece(s) | 7 Day(s) or more | M2.6 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 0.45 | 46 | P1 | 4 | 14 | 3 | 2.5 | 5 | 2 | d | Oxidation treatment | 45° | ||
MYR 49.81 | 1 Piece(s) | 10 Day(s) | M3 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 0.5 | 46 | P1 | 5 | 14 | 4 | 3.2 | 6 | 3 | d | Oxidation treatment | 45° | ||
MYR 94.72 | 1 Piece(s) | 8 Day(s) | M3.5 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 0.6 | 52 | P1 | 7 | 16 | 5 | 4 | 7 | 3 | d | Oxidation treatment | 45° | ||
MYR 136.40 | 1 Piece(s) | 7 Day(s) or more | M10 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 1 | 75 | P2 | 13 | - | 7 | 5.5 | 8 | 3 | e-1 | Oxidation treatment | 45° | ||
MYR 91.05 | 1 Piece(s) | 9 Day(s) | M10 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 1.25 | 75 | P2 | 13 | - | 7 | 5.5 | 8 | 3 | e-1 | Oxidation treatment | 45° | ||
MYR 91.05 | 1 Piece(s) | 9 Day(s) | M10 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 1.5 | 75 | P2 | 13 | - | 7 | 5.5 | 8 | 3 | e-1 | Oxidation treatment | 45° | ||
MYR 187.63 | 1 Piece(s) | 7 Day(s) or more | M12 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 1 | 82 | P2 | 15 | - | 8.5 | 6.5 | 9 | 3 | e-1 | Oxidation treatment | 45° | ||
MYR 150.20 | 1 Piece(s) | 7 Day(s) | M12 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 1.25 | 82 | P2 | 15 | - | 8.5 | 6.5 | 9 | 3 | e-1 | Oxidation treatment | 45° | ||
MYR 160.87 | 1 Piece(s) | 7 Day(s) or more | M12 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 1.5 | 82 | P2 | 15 | - | 8.5 | 6.5 | 9 | 3 | e-1 | Oxidation treatment | 45° | ||
MYR 126.70 | 1 Piece(s) | 9 Day(s) | M12 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 1.75 | 82 | P2 | 15 | - | 8.5 | 6.5 | 9 | 3 | e-1 | Oxidation treatment | 45° | ||
MYR 250.43 | 1 Piece(s) | 7 Day(s) or more | M14 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 1 | 88 | P2 | 14 | - | 10.5 | 8 | 11 | 3 | e-1 | Oxidation treatment | 45° | ||
MYR 203.33 | 1 Piece(s) | 7 Day(s) | M14 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 1.5 | 88 | P2 | 14 | - | 10.5 | 8 | 11 | 3 | e-1 | Oxidation treatment | 45° | ||
MYR 170.55 | 1 Piece(s) | 10 Day(s) | M14 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 2 | 88 | P2 | 18 | - | 10.5 | 8 | 11 | 3 | e-1 | Oxidation treatment | 45° | ||
MYR 341.33 | 1 Piece(s) | 7 Day(s) or more | M16 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 1 | 95 | P2 | 14 | - | 12.5 | 10 | 13 | 3 | e-1 | Oxidation treatment | 45° | ||
MYR 226.06 | 1 Piece(s) | 10 Day(s) | M16 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 1.5 | 95 | P2 | 14 | - | 12.5 | 10 | 13 | 3 | e-1 | Oxidation treatment | 45° | ||
MYR 226.06 | 1 Piece(s) | 9 Day(s) | M16 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 2 | 95 | P2 | 18 | - | 12.5 | 10 | 13 | 3 | e-1 | Oxidation treatment | 45° | ||
MYR 493.76 | 1 Piece(s) | 7 Day(s) or more | M18 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 1 | 100 | P2 | 14 | - | 14 | 11 | 14 | 4 | e-1 | Oxidation treatment | 45° | ||
MYR 354.00 | 1 Piece(s) | 7 Day(s) or more | M18 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 1.5 | 100 | P2 | 14 | - | 14 | 11 | 14 | 4 | e-1 | Oxidation treatment | 45° | ||
MYR 640.87 | 1 Piece(s) | 7 Day(s) or more | M20 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 1 | 105 | P2 | 14 | - | 15 | 12 | 15 | 4 | e-1 | Oxidation treatment | 45° | ||
MYR 49.81 | 1 Piece(s) | 9 Day(s) | M4 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 0.7 | 52 | P2 | 7 | 17 | 5 | 4 | 7 | 3 | d | Oxidation treatment | 45° | ||
MYR 50.55 | 1 Piece(s) | 9 Day(s) | M5 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 0.8 | 60 | P2 | 9 | 22 | 5.5 | 4.5 | 7 | 3 | d | Oxidation treatment | 45° | ||
MYR 59.39 | 1 Piece(s) | 10 Day(s) | M6 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 1 | 62 | P2 | 11 | 26 | 6 | 4.5 | 7 | 3 | d | Oxidation treatment | 45° | ||
MYR 104.75 | 1 Piece(s) | 7 Day(s) or more | M8 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 1 | 70 | P2 | 12 | - | 6.2 | 5 | 8 | 3 | e-1 | Oxidation treatment | 45° | ||
MYR 72.90 | 1 Piece(s) | 9 Day(s) | M8 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 1.25 | 70 | P2 | 12 | - | 6.2 | 5 | 8 | 3 | e-1 | Oxidation treatment | 45° | ||
MYR 104.57 | 1 Piece(s) | 7 Day(s) or more | M10 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 1.5 | 75 | P3 | 13 | - | 7 | 5.5 | 8 | 3 | e-1 | Oxidation treatment | 45° | ||
MYR 145.42 | 1 Piece(s) | 7 Day(s) or more | M12 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 1.75 | 82 | P3 | 15 | - | 8.5 | 6.5 | 9 | 3 | e-1 | Oxidation treatment | 45° | ||
MYR 381.00 | 1 Piece(s) | 7 Day(s) or more | M18 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 2 | 100 | P3 | 18 | - | 14 | 11 | 14 | 4 | e-1 | Oxidation treatment | 45° | ||
MYR 300.03 | 1 Piece(s) | 10 Day(s) | M18 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 2.5 | 100 | P3 | 20 | - | 14 | 11 | 14 | 4 | e-1 | Oxidation treatment | 45° | ||
MYR 465.82 | 1 Piece(s) | 7 Day(s) or more | M20 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 1.5 | 105 | P3 | 14 | - | 15 | 12 | 15 | 4 | e-1 | Oxidation treatment | 45° | ||
MYR 409.25 | 1 Piece(s) | 9 Day(s) | M20 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 2.5 | 105 | P3 | 20 | - | 15 | 12 | 15 | 4 | e-1 | Oxidation treatment | 45° | ||
MYR 588.31 | 1 Piece(s) | 7 Day(s) or more | M22 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 1.5 | 115 | P3 | 14 | - | 17 | 13 | 16 | 4 | e-1 | Oxidation treatment | 45° | ||
MYR 645.26 | 1 Piece(s) | 7 Day(s) or more | M22 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 2 | 115 | P3 | 18 | - | 17 | 13 | 16 | 4 | e-1 | Oxidation treatment | 45° | ||
MYR 521.33 | 1 Piece(s) | 10 Day(s) | M22 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 2.5 | 115 | P3 | 20 | - | 17 | 13 | 16 | 4 | e-1 | Oxidation treatment | 45° | ||
MYR 805.72 | 1 Piece(s) | 7 Day(s) or more | M24 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 1.5 | 120 | P3 | 18 | - | 19 | 15 | 18 | 4 | e-1 | Oxidation treatment | 45° | ||
MYR 805.72 | 1 Piece(s) | 7 Day(s) or more | M24 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 2 | 120 | P3 | 18 | - | 19 | 15 | 18 | 4 | e-1 | Oxidation treatment | 45° | ||
MYR 645.73 | 1 Piece(s) | 10 Day(s) | M24 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 3 | 120 | P3 | 25 | - | 19 | 15 | 18 | 4 | e-1 | Oxidation treatment | 45° | ||
MYR 1,135.48 | 1 Piece(s) | 7 Day(s) or more | M27 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 1.5 | 130 | P3 | 20 | - | 20 | 15 | 18 | 4 | e-1 | Oxidation treatment | 45° | ||
MYR 1,135.48 | 1 Piece(s) | 7 Day(s) or more | M27 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 2 | 130 | P3 | 20 | - | 20 | 15 | 18 | 4 | e-1 | Oxidation treatment | 45° | ||
MYR 1,135.48 | 1 Piece(s) | 7 Day(s) or more | M27 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 3 | 130 | P3 | 25 | - | 20 | 15 | 18 | 4 | e-1 | Oxidation treatment | 45° | ||
MYR 2,208.23 | 1 Piece(s) | 7 Day(s) or more | M30 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 1.5 | 135 | P3 | 20 | - | 23 | 17 | 20 | 4 | e-1 | Oxidation treatment | 45° | ||
MYR 1,447.42 | 1 Piece(s) | 7 Day(s) or more | M30 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 2 | 135 | P3 | 20 | - | 23 | 17 | 20 | 4 | e-1 | Oxidation treatment | 45° | ||
MYR 1,447.42 | 1 Piece(s) | 7 Day(s) or more | M30 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 3 | 135 | P3 | 28 | - | 23 | 17 | 20 | 4 | e-1 | Oxidation treatment | 45° | ||
MYR 1,543.12 | 1 Piece(s) | 7 Day(s) or more | M33 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[◎] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[◎] / Stainless steel (SUS)[○] / Quenched and tempered steel (25 to 35 HRC)[○] / Steel casting (SC)[○] | 1.5 | 145 | P3 | 20 | - | 25 | 19 | 22 | 4 | 3 | Oxide Treatment | - | ||
MYR 1,543.12 | 1 Piece(s) | 7 Day(s) or more | M33 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[◎] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[◎] / Stainless steel (SUS)[○] / Quenched and tempered steel (25 to 35 HRC)[○] / Steel casting (SC)[○] | 2 | 145 | P3 | 20 | - | 25 | 19 | 22 | 4 | 3 | Oxide Treatment | - | ||
MYR 2,568.39 | 1 Piece(s) | 8 Day(s) | M33 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[◎] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[◎] / Stainless steel (SUS)[○] / Quenched and tempered steel (25 to 35 HRC)[○] / Steel casting (SC)[○] | 3 | 145 | P3 | 28 | - | 25 | 19 | 22 | 4 | 3 | Oxide Treatment | - | ||
MYR 2,975.83 | 1 Piece(s) | 7 Day(s) or more | M36 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[◎] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[◎] / Stainless steel (SUS)[○] / Quenched and tempered steel (25 to 35 HRC)[○] / Steel casting (SC)[○] | 1.5 | 155 | P3 | 20 | - | 28 | 21 | 24 | 4 | 3 | Oxide Treatment | - | ||
MYR 1,786.20 | 1 Piece(s) | 7 Day(s) or more | M36 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[◎] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[◎] / Stainless steel (SUS)[○] / Quenched and tempered steel (25 to 35 HRC)[○] / Steel casting (SC)[○] | 3 | 155 | P3 | 30 | - | 28 | 21 | 24 | 4 | 3 | Oxide Treatment | - | ||
MYR 57.82 | 1 Piece(s) | 7 Day(s) or more | M3 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 0.5 | 46 | P3 | 5 | 14 | 4 | 3.2 | 6 | 3 | d | Oxidation treatment | 45° | ||
MYR 56.30 | 1 Piece(s) | 7 Day(s) or more | M4 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 0.7 | 52 | P3 | 7 | 17 | 5 | 4 | 7 | 3 | d | Oxidation treatment | 45° | ||
MYR 57.14 | 1 Piece(s) | 7 Day(s) or more | M5 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 0.8 | 60 | P3 | 9 | 22 | 5.5 | 4.5 | 7 | 3 | d | Oxidation treatment | 45° | ||
MYR 95.43 | 1 Piece(s) | 8 Day(s) | M6 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 1 | 62 | P3 | 11 | 26 | 6 | 4.5 | 7 | 3 | d | Oxidation treatment | 45° | ||
MYR 85.00 | 1 Piece(s) | 7 Day(s) or more | M8 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 1.25 | 70 | P3 | 12 | - | 6.2 | 5 | 8 | 3 | e-1 | Oxidation treatment | 45° | ||
MYR 1,447.42 | 1 Piece(s) | 6 Day(s) or more | M30 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[○] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[○] / Stainless steel (SUS)[○] / Steel casting (SC)[○] | 3.5 | 135 | P4 | 30 | - | 23 | 17 | 20 | 4 | e-1 | Oxidation treatment | 45° | ||
MYR 1,543.12 | 1 Piece(s) | 7 Day(s) or more | M33 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[◎] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[◎] / Stainless steel (SUS)[○] / Quenched and tempered steel (25 to 35 HRC)[○] / Steel casting (SC)[○] | 3.5 | 145 | P4 | 30 | - | 25 | 19 | 22 | 4 | 3 | Oxide Treatment | - | ||
MYR 1,786.20 | 1 Piece(s) | 7 Day(s) or more | M36 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[◎] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[◎] / Stainless steel (SUS)[○] / Quenched and tempered steel (25 to 35 HRC)[○] / Steel casting (SC)[○] | 4 | 155 | P4 | 40 | - | 28 | 21 | 24 | 4 | 3 | Oxide Treatment | - | ||
MYR 2,037.38 | 1 Piece(s) | 7 Day(s) or more | M39 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[◎] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[◎] / Stainless steel (SUS)[○] / Quenched and tempered steel (25 to 35 HRC)[○] / Steel casting (SC)[○] | 4 | 165 | P4 | 40 | - | 30 | 23 | 26 | 4 | 3 | Oxide Treatment | - | ||
MYR 2,478.98 | 1 Piece(s) | 7 Day(s) or more | M42 | Low-Carbon Steel (carbon alloy less than 0.25%)[○] / Medium carbon steel (carbon content 0.25 to 0.45%)[◎] / High Carbon Steel (C with a content over 0.45%)[○] / Alloy Steel (SCM)[◎] / Stainless steel (SUS)[○] / Quenched and tempered steel (25 to 35 HRC)[○] / Steel casting (SC)[○] | 4.5 | 175 | P4 | 40 | - | 32 | 26 | 30 | 4 | 3 | Oxide Treatment | - |
Loading...
| Screw Types | Meter | Tool Material Type | High-speed steel | Tap Type | Spiral Tap |
|---|---|---|---|---|---|
| Hole type | For blind hole | Chamfer threads | 2.5P | Coating Y/N | NA |

YAMAWA MFG
Standard Price : MYR 107.05-
Days to Ship : 5 Day(s) or more

YAMAWA MFG
Standard Price : MYR 43.08-
Days to Ship : 1 Day(s) or more

OSG
Standard Price : MYR 275.91-
Days to Ship : 5 Day(s) or more


OSG
Standard Price : MYR 58.37-
Days to Ship : 5 Day(s) or more

OSG
Standard Price : MYR 64.12-
Days to Ship : 5 Day(s) or more

SKC
Standard Price : MYR 124.25-
Days to Ship : 6 Day(s) or more

YAMAWA MFG
Standard Price : MYR 38.73-
Days to Ship : 5 Day(s) or more

YAMAWA MFG
Standard Price : MYR 65.60-
Days to Ship : 8 Day(s) or more


YAMAWA MFG
Standard Price : MYR 40.00-
Days to Ship : 7 Day(s) or more

How can we improve?
How can we improve?
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Customer Privacy Policy
Thank you for your cooperation.
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Please use the inquiry form.
Customer Privacy Policy