(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
An air slide table made by SMC
[Features]
· A further upgrade from the CY1 series
· The installation dimensions are the same as the CY1 series, yet it features improved bearing performance and reduced sliding resistance.
· NPT screws and G screws are standardized
Part Number
Configured Part Number is shown.
| Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Days to Ship | Cylinder I.D. (Ø) | Type | Stroke (mm) | Table Size: Length L (mm) | Stroke (Range) (mm) | Max. Load Mass (Horizontal Mounting) (kg) | Maximum Loading Weight (Range) (kg) | Table Material | Table Size: Width W (mm) | Guide Type | Table Size Length (Range) (mm) | Rodless Cylinder Joint Type | Table Size Width (Range) (mm) | Environment | Table Size Height (Range) (mm) | Table Size: Height H (mm) | Max. Load Mass (kg) | Table Surface Treatment | Operating Pressure (MPa) | Max. Operating Pressure (MPa) | Min. Operating Pressure (MPa) | Piping Format | Port Screw Type | Cushion | Switch Rail | Specifications | Auto Switches | Lead Wire Length (m) | Lead Wire Connector | The number of the switches | Custom-made Specifications | Made-to-order | Type | Applicable inner diameter of cylinder (ø) | Stroke (mm) | Table size length (mm) | Table size width (mm) | Table size height | Table Surface Treatment |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
MYR 186.52 | 1 Piece(s) | 27 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
MYR 194.28 | 1 Piece(s) | 27 Day(s) or more | - | - | 550 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 32 | - | - | - | - | - | ||
MYR 202.10 | 1 Piece(s) | 27 Day(s) or more | - | - | 600 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 32 | - | - | - | - | - | ||
MYR 209.74 | 1 Piece(s) | 27 Day(s) or more | - | - | 650 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 32 | - | - | - | - | - | ||
MYR 217.55 | 1 Piece(s) | 27 Day(s) or more | - | - | 700 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 32 | - | - | - | - | - | ||
MYR 225.37 | 1 Piece(s) | 27 Day(s) or more | - | - | 750 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 32 | - | - | - | - | - | ||
MYR 239.81 | 1 Piece(s) | 27 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
MYR 240.83 | 1 Piece(s) | 27 Day(s) or more | - | - | 850 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 32 | - | - | - | - | - | ||
MYR 248.58 | 1 Piece(s) | 27 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
MYR 256.40 | 1 Piece(s) | 27 Day(s) or more | - | - | 950 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 32 | - | - | - | - | - | ||
MYR 139.30 | 1 Piece(s) | 27 Day(s) or more | - | - | 100 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 278.66 | 1 Piece(s) | 27 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
MYR 285.39 | 1 Piece(s) | 27 Day(s) or more | - | - | 1,050 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 297.62 | 1 Piece(s) | 27 Day(s) or more | - | - | 1,100 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 302.30 | 1 Piece(s) | 27 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
MYR 303.74 | 1 Piece(s) | 27 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
MYR 311.55 | 1 Piece(s) | 27 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
MYR 328.03 | 1 Piece(s) | 27 Day(s) or more | - | - | 1,300 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 333.86 | 1 Piece(s) | 27 Day(s) or more | - | - | 1350 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 340.26 | 1 Piece(s) | 27 Day(s) or more | - | - | 1400 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 346.32 | 1 Piece(s) | 27 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
MYR 145.47 | 1 Piece(s) | 27 Day(s) or more | - | - | 150 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 358.49 | 1 Piece(s) | 27 Day(s) or more | - | - | 1,500 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 364.55 | 1 Piece(s) | 27 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
MYR 366.70 | 1 Piece(s) | 27 Day(s) or more | - | - | 1600 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 374.52 | 1 Piece(s) | 27 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
MYR 388.96 | 1 Piece(s) | 27 Day(s) or more | - | - | 1,700 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 395.02 | 1 Piece(s) | 27 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
MYR 401.08 | 1 Piece(s) | 27 Day(s) or more | - | - | 1,800 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 412.69 | 1 Piece(s) | 27 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
MYR 419.42 | 1 Piece(s) | 27 Day(s) or more | - | - | 1,900 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 425.48 | 1 Piece(s) | 27 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
MYR 152.52 | 1 Piece(s) | 27 Day(s) or more | - | - | 200 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 429.67 | 1 Piece(s) | 27 Day(s) or more | - | - | 2,000 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 160.40 | 1 Piece(s) | 27 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
MYR 168.32 | 1 Piece(s) | 27 Day(s) or more | - | - | 300 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 175.88 | 1 Piece(s) | 27 Day(s) or more | - | - | 350 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 181.99 | 1 Piece(s) | 27 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
MYR 194.17 | 1 Piece(s) | 27 Day(s) or more | - | - | 450 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 199.84 | 1 Piece(s) | 27 Day(s) or more | - | - | 500 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 212.40 | 1 Piece(s) | 27 Day(s) or more | - | - | 550 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 214.85 | 1 Piece(s) | 27 Day(s) or more | - | - | 600 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 224.58 | 1 Piece(s) | 27 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
MYR 230.69 | 1 Piece(s) | 27 Day(s) or more | - | - | 700 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 242.87 | 1 Piece(s) | 27 Day(s) or more | - | - | 750 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 242.87 | 1 Piece(s) | 27 Day(s) or more | - | - | 800 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 248.47 | 1 Piece(s) | 27 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
MYR 261.10 | 1 Piece(s) | 27 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
MYR 270.79 | 1 Piece(s) | 27 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
MYR 137.03 | 1 Piece(s) | 27 Day(s) or more | - | - | 100 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 284.26 | 1 Piece(s) | 27 Day(s) or more | - | - | 1,000 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 284.48 | 1 Piece(s) | 27 Day(s) or more | - | - | 1,050 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 292.30 | 1 Piece(s) | 27 Day(s) or more | - | - | 1,100 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 300.06 | 1 Piece(s) | 27 Day(s) or more | - | - | 1150 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 307.87 | 1 Piece(s) | 27 Day(s) or more | - | - | 1,200 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 315.63 | 1 Piece(s) | 27 Day(s) or more | - | - | 1250 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 323.27 | 1 Piece(s) | 27 Day(s) or more | - | - | 1,300 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 331.14 | 1 Piece(s) | 27 Day(s) or more | - | - | 1350 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 338.90 | 1 Piece(s) | 27 Day(s) or more | - | - | 1400 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 346.60 | 1 Piece(s) | 27 Day(s) or more | - | - | 1450 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 144.85 | 1 Piece(s) | 27 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
MYR 354.36 | 1 Piece(s) | 27 Day(s) or more | - | - | 1,500 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 362.12 | 1 Piece(s) | 27 Day(s) or more | - | - | 1550 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 369.99 | 1 Piece(s) | 27 Day(s) or more | - | - | 1600 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 377.69 | 1 Piece(s) | 27 Day(s) or more | - | - | 1650 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 385.39 | 1 Piece(s) | 27 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
MYR 393.20 | 1 Piece(s) | 27 Day(s) or more | - | - | 1750 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 400.96 | 1 Piece(s) | 27 Day(s) or more | - | - | 1,800 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 408.72 | 1 Piece(s) | 27 Day(s) or more | - | - | 1850 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 416.48 | 1 Piece(s) | 27 Day(s) or more | - | - | 1,900 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 424.24 | 1 Piece(s) | 27 Day(s) or more | - | - | 1950 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 154.81 | 1 Piece(s) | 27 Day(s) or more | - | - | 200 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 432.05 | 1 Piece(s) | 27 Day(s) or more | - | - | 2,000 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 162.91 | 1 Piece(s) | 27 Day(s) or more | - | - | 250 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 171.12 | 1 Piece(s) | 27 Day(s) or more | - | - | 300 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 175.88 | 1 Piece(s) | 27 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
MYR 183.69 | 1 Piece(s) | 27 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
MYR 191.39 | 1 Piece(s) | 27 Day(s) or more | - | - | 450 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 199.15 | 1 Piece(s) | 27 Day(s) or more | - | - | 500 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 206.91 | 1 Piece(s) | 27 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
MYR 214.72 | 1 Piece(s) | 27 Day(s) or more | - | - | 600 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 222.42 | 1 Piece(s) | 27 Day(s) or more | - | - | 650 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 230.18 | 1 Piece(s) | 27 Day(s) or more | - | - | 700 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 238.00 | 1 Piece(s) | 27 Day(s) or more | - | - | 750 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 251.76 | 1 Piece(s) | 27 Day(s) or more | - | - | 800 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 253.51 | 1 Piece(s) | 27 Day(s) or more | - | - | 850 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 267.95 | 1 Piece(s) | 27 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
MYR 269.03 | 1 Piece(s) | 27 Day(s) or more | - | - | 950 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 40 | - | - | - | - | - | ||
MYR 157.59 | 1 Piece(s) | 27 Day(s) or more | - | - | 100 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 50 | - | - | - | - | - | ||
MYR 373.25 | 1 Piece(s) | 27 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
Loading...
How can we improve?
How can we improve?
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Customer Privacy Policy
Thank you for your cooperation.
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Please use the inquiry form.
Customer Privacy Policy