(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
An air slide table made by SMC
[Features]
· A further upgrade from the CY1 series
· The installation dimensions are the same as the CY1 series, yet it features improved bearing performance and reduced sliding resistance.
· NPT screws and G screws are standardized
Part Number
Configured Part Number is shown.
| Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Days to Ship | Cylinder I.D. (Ø) | Type | Stroke (mm) | Table Size: Length L (mm) | Stroke (Range) (mm) | Max. Load Mass (Horizontal Mounting) (kg) | Maximum Loading Weight (Range) (kg) | Table Material | Table Size: Width W (mm) | Guide Type | Table Size Length (Range) (mm) | Rodless Cylinder Joint Type | Table Size Width (Range) (mm) | Environment | Table Size Height (Range) (mm) | Table Size: Height H (mm) | Max. Load Mass (kg) | Table Surface Treatment | Operating Pressure (MPa) | Max. Operating Pressure (MPa) | Min. Operating Pressure (MPa) | Piping Format | Port Screw Type | Cushion | Switch Rail | Specifications | Auto Switches | Lead Wire Length (m) | Lead Wire Connector | The number of the switches | Custom-made Specifications | Made-to-order | Type | Applicable inner diameter of cylinder (ø) | Stroke (mm) | Table size length (mm) | Table size width (mm) | Table size height | Table Surface Treatment |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
MYR 196.27 | 1 Piece(s) | 27 Day(s) or more | - | - | 1,050 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | For non-contact switch | - | - | - | - | - | Switch rail | 20 | - | - | - | - | - | ||
MYR 215.13 | 1 Piece(s) | 27 Day(s) or more | - | - | 1,100 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | For non-contact switch | - | - | - | - | - | Switch rail | 20 | - | - | - | - | - | ||
MYR 204.15 | 1 Piece(s) | 27 Day(s) or more | - | - | 1150 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | For non-contact switch | - | - | - | - | - | Switch rail | 20 | - | - | - | - | - | ||
MYR 222.96 | 1 Piece(s) | 27 Day(s) or more | - | - | 1,200 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | For non-contact switch | - | - | - | - | - | Switch rail | 20 | - | - | - | - | - | ||
MYR 213.40 | 1 Piece(s) | 27 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
MYR 230.89 | 1 Piece(s) | 27 Day(s) or more | - | - | 1,300 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | For non-contact switch | - | - | - | - | - | Switch rail | 20 | - | - | - | - | - | ||
MYR 219.85 | 1 Piece(s) | 27 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
MYR 238.77 | 1 Piece(s) | 27 Day(s) or more | - | - | 1400 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | For non-contact switch | - | - | - | - | - | Switch rail | 20 | - | - | - | - | - | ||
MYR 227.78 | 1 Piece(s) | 27 Day(s) or more | - | - | 1450 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | For non-contact switch | - | - | - | - | - | Switch rail | 20 | - | - | - | - | - | ||
MYR 121.40 | 1 Piece(s) | 27 Day(s) or more | - | - | 150 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | For non-contact switch | - | - | - | - | - | Switch rail | 20 | - | - | - | - | - | ||
MYR 246.69 | 1 Piece(s) | 27 Day(s) or more | - | - | 1,500 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | For non-contact switch | - | - | - | - | - | Switch rail | 20 | - | - | - | - | - | ||
MYR 254.57 | 1 Piece(s) | 27 Day(s) or more | - | - | 1600 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | For non-contact switch | - | - | - | - | - | Switch rail | 20 | - | - | - | - | - | ||
MYR 262.40 | 1 Piece(s) | 27 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
MYR 270.33 | 1 Piece(s) | 27 Day(s) or more | - | - | 1,800 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | For non-contact switch | - | - | - | - | - | Switch rail | 20 | - | - | - | - | - | ||
MYR 278.21 | 1 Piece(s) | 27 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
MYR 133.30 | 1 Piece(s) | 27 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
MYR 286.08 | 1 Piece(s) | 27 Day(s) or more | - | - | 2,000 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | For non-contact switch | - | - | - | - | - | Switch rail | 20 | - | - | - | - | - | ||
MYR 139.69 | 1 Piece(s) | 27 Day(s) or more | - | - | 250 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | For non-contact switch | - | - | - | - | - | Switch rail | 20 | - | - | - | - | - | ||
MYR 152.04 | 1 Piece(s) | 27 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
MYR 139.30 | 1 Piece(s) | 27 Day(s) or more | - | - | 300 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | For non-contact switch | - | - | - | - | - | Switch rail | 20 | - | - | - | - | - | ||
MYR 145.75 | 1 Piece(s) | 27 Day(s) or more | - | - | 350 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | For non-contact switch | - | - | - | - | - | Switch rail | 20 | - | - | - | - | - | ||
MYR 151.53 | 1 Piece(s) | 27 Day(s) or more | - | - | 400 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | For non-contact switch | - | - | - | - | - | Switch rail | 20 | - | - | - | - | - | ||
MYR 157.93 | 1 Piece(s) | 27 Day(s) or more | - | - | 450 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | For non-contact switch | - | - | - | - | - | Switch rail | 20 | - | - | - | - | - | ||
MYR 163.70 | 1 Piece(s) | 27 Day(s) or more | - | - | 500 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | For non-contact switch | - | - | - | - | - | Switch rail | 20 | - | - | - | - | - | ||
MYR 170.10 | 1 Piece(s) | 27 Day(s) or more | - | - | 550 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | For non-contact switch | - | - | - | - | - | Switch rail | 20 | - | - | - | - | - | ||
MYR 175.74 | 1 Piece(s) | 27 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
MYR 176.22 | 1 Piece(s) | 27 Day(s) or more | - | - | 650 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | For non-contact switch | - | - | - | - | - | Switch rail | 20 | - | - | - | - | - | ||
MYR 181.99 | 1 Piece(s) | 27 Day(s) or more | - | - | 700 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | For non-contact switch | - | - | - | - | - | Switch rail | 20 | - | - | - | - | - | ||
MYR 182.28 | 1 Piece(s) | 27 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
MYR 191.45 | 1 Piece(s) | 27 Day(s) or more | - | - | 800 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | For non-contact switch | - | - | - | - | - | Switch rail | 20 | - | - | - | - | - | ||
MYR 195.76 | 1 Piece(s) | 27 Day(s) or more | - | - | 850 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | For non-contact switch | - | - | - | - | - | Switch rail | 20 | - | - | - | - | - | ||
MYR 199.38 | 1 Piece(s) | 27 Day(s) or more | - | - | 900 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | For non-contact switch | - | - | - | - | - | Switch rail | 20 | - | - | - | - | - | ||
MYR 203.64 | 1 Piece(s) | 27 Day(s) or more | - | - | 950 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | For non-contact switch | - | - | - | - | - | Switch rail | 20 | - | - | - | - | - | ||
MYR 121.12 | 1 Piece(s) | 27 Day(s) or more | - | - | 100 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 25 | - | - | - | - | - | ||
MYR 207.26 | 1 Piece(s) | 27 Day(s) or more | - | - | 1,000 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 25 | - | - | - | - | - | ||
MYR 196.27 | 1 Piece(s) | 27 Day(s) or more | - | - | 1,050 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 25 | - | - | - | - | - | ||
MYR 215.13 | 1 Piece(s) | 27 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
MYR 204.15 | 1 Piece(s) | 27 Day(s) or more | - | - | 1150 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 25 | - | - | - | - | - | ||
MYR 222.96 | 1 Piece(s) | 27 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
MYR 213.40 | 1 Piece(s) | 27 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
MYR 230.89 | 1 Piece(s) | 27 Day(s) or more | - | - | 1,300 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 25 | - | - | - | - | - | ||
MYR 221.28 | 1 Piece(s) | 27 Day(s) or more | - | - | 1350 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 25 | - | - | - | - | - | ||
MYR 238.77 | 1 Piece(s) | 27 Day(s) or more | - | - | 1400 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 25 | - | - | - | - | - | ||
MYR 227.78 | 1 Piece(s) | 27 Day(s) or more | - | - | 1450 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 25 | - | - | - | - | - | ||
MYR 121.40 | 1 Piece(s) | 27 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
MYR 246.69 | 1 Piece(s) | 27 Day(s) or more | - | - | 1,500 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 25 | - | - | - | - | - | ||
MYR 235.66 | 1 Piece(s) | 27 Day(s) or more | - | - | 1550 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 25 | - | - | - | - | - | ||
MYR 254.57 | 1 Piece(s) | 27 Day(s) or more | - | - | 1600 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 25 | - | - | - | - | - | ||
MYR 243.59 | 1 Piece(s) | 27 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
MYR 262.40 | 1 Piece(s) | 27 Day(s) or more | - | - | 1,700 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 25 | - | - | - | - | - | ||
MYR 251.41 | 1 Piece(s) | 27 Day(s) or more | - | - | 1750 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 25 | - | - | - | - | - | ||
MYR 270.33 | 1 Piece(s) | 27 Day(s) or more | - | - | 1,800 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 25 | - | - | - | - | - | ||
MYR 259.29 | 1 Piece(s) | 27 Day(s) or more | - | - | 1850 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 25 | - | - | - | - | - | ||
MYR 278.21 | 1 Piece(s) | 27 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
MYR 267.17 | 1 Piece(s) | 27 Day(s) or more | - | - | 1950 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 25 | - | - | - | - | - | ||
MYR 128.88 | 1 Piece(s) | 27 Day(s) or more | - | - | 200 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 25 | - | - | - | - | - | ||
MYR 286.08 | 1 Piece(s) | 27 Day(s) or more | - | - | 2,000 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 25 | - | - | - | - | - | ||
MYR 133.19 | 1 Piece(s) | 27 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
MYR 139.30 | 1 Piece(s) | 27 Day(s) or more | - | - | 300 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 25 | - | - | - | - | - | ||
MYR 141.02 | 1 Piece(s) | 27 Day(s) or more | - | - | 350 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 25 | - | - | - | - | - | ||
MYR 144.64 | 1 Piece(s) | 27 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
MYR 148.90 | 1 Piece(s) | 27 Day(s) or more | - | - | 450 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 25 | - | - | - | - | - | ||
MYR 152.52 | 1 Piece(s) | 27 Day(s) or more | - | - | 500 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 25 | - | - | - | - | - | ||
MYR 170.10 | 1 Piece(s) | 27 Day(s) or more | - | - | 550 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 25 | - | - | - | - | - | ||
MYR 159.70 | 1 Piece(s) | 27 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
MYR 176.22 | 1 Piece(s) | 27 Day(s) or more | - | - | 650 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 25 | - | - | - | - | - | ||
MYR 168.32 | 1 Piece(s) | 27 Day(s) or more | - | - | 700 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 25 | - | - | - | - | - | ||
MYR 182.28 | 1 Piece(s) | 27 Day(s) or more | - | - | 750 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 25 | - | - | - | - | - | ||
MYR 191.45 | 1 Piece(s) | 27 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
MYR 195.76 | 1 Piece(s) | 27 Day(s) or more | - | - | 850 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 25 | - | - | - | - | - | ||
MYR 199.38 | 1 Piece(s) | 27 Day(s) or more | - | - | 900 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Centralized piping type (CY3RG) | - | - | - | - | - | - | - | - | - | - | Switch rail | 25 | - | - | - | - | - | ||
MYR 203.64 | 1 Piece(s) | 27 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
MYR 119.03 | 1 Piece(s) | 27 Day(s) or more | - | - | 100 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 25 | - | - | - | - | - | ||
MYR 207.26 | 1 Piece(s) | 27 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
MYR 211.57 | 1 Piece(s) | 27 Day(s) or more | - | - | 1,050 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 25 | - | - | - | - | - | ||
MYR 215.13 | 1 Piece(s) | 27 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
MYR 219.44 | 1 Piece(s) | 27 Day(s) or more | - | - | 1150 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 25 | - | - | - | - | - | ||
MYR 222.96 | 1 Piece(s) | 27 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
MYR 227.27 | 1 Piece(s) | 27 Day(s) or more | - | - | 1250 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 25 | - | - | - | - | - | ||
MYR 230.89 | 1 Piece(s) | 27 Day(s) or more | - | - | 1,300 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 25 | - | - | - | - | - | ||
MYR 235.20 | 1 Piece(s) | 27 Day(s) or more | - | - | 1350 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 25 | - | - | - | - | - | ||
MYR 238.77 | 1 Piece(s) | 27 Day(s) or more | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
MYR 243.08 | 1 Piece(s) | 27 Day(s) or more | - | - | 1450 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 25 | - | - | - | - | - | ||
MYR 124.46 | 1 Piece(s) | 27 Day(s) or more | - | - | 150 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 25 | - | - | - | - | - | ||
MYR 246.69 | 1 Piece(s) | 27 Day(s) or more | - | - | 1,500 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 25 | - | - | - | - | - | ||
MYR 250.96 | 1 Piece(s) | 27 Day(s) or more | - | - | 1550 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 25 | - | - | - | - | - | ||
MYR 254.57 | 1 Piece(s) | 27 Day(s) or more | - | - | 1600 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 25 | - | - | - | - | - | ||
MYR 258.88 | 1 Piece(s) | 27 Day(s) or more | - | - | 1650 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 25 | - | - | - | - | - | ||
MYR 262.40 | 1 Piece(s) | 27 Day(s) or more | - | - | 1,700 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 25 | - | - | - | - | - | ||
MYR 266.71 | 1 Piece(s) | 27 Day(s) or more | - | - | 1750 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Both sides piping type (CY3R) | - | - | - | - | - | - | - | - | - | - | Switch rail | 25 | - | - | - | - | - |
Loading...
How can we improve?
How can we improve?
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Customer Privacy Policy
Thank you for your cooperation.
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Please use the inquiry form.
Customer Privacy Policy