(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
· The latest product from CK metals is a stainless steel fitting with sealing material. Eliminates problems such as "galling", "sealing material contamination", and "leaks" in stainless steel screw-in fittings. The definitive stainless steel fitting series, used in all sectors related to food, medical, and precision parts. There's no need to apply sealant any longer. Also drastically reduces re-piping and repairs
Japanese Only
| Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Days to Ship | Nominal of Thread M1 | Nominal of Thread M2 |
|---|---|---|---|---|---|---|
MYR 54.73 | 1 Piece(s) | 9 Day(s) or more | 1/4B(8A) | 1/8B(6A) | ||
MYR 54.73 | 1 Piece(s) | 9 Day(s) or more | 3/8B(10A) | 1/4B(8A) | ||
MYR 60.48 | 1 Piece(s) | 9 Day(s) or more | 1/2B(15A) | 1/4B(8A) | ||
MYR 54.73 | 1 Piece(s) | 9 Day(s) or more | 1/2B(15A) | 3/8B(10A) | ||
MYR 83.10 | 1 Piece(s) | 9 Day(s) or more | 3/4B(20A) | 3/8B(10A) | ||
MYR 83.10 | 1 Piece(s) | 9 Day(s) or more | 3/4B(20A) | 1/2B(15A) | ||
MYR 109.09 | 1 Piece(s) | 9 Day(s) or more | 1B(25A) | 1/2B(15A) | ||
MYR 109.09 | 1 Piece(s) | 9 Day(s) or more | 1B(25A) | 3/4B(20A) | ||
MYR 147.91 | 1 Piece(s) | 9 Day(s) or more | 1 1/4B(32A) | 3/4B(20A) | ||
MYR 147.91 | 1 Piece(s) | 9 Day(s) or more | 1 1/4B(32A) | 1B(25A) | ||
MYR 182.35 | 1 Piece(s) | 9 Day(s) or more | 1 1/2B(40A) | 1B(25A) | ||
MYR 182.35 | 1 Piece(s) | 9 Day(s) or more | 1 1/2B(40A) | 1 1/4B(32A) | ||
MYR 249.53 | 1 Piece(s) | 9 Day(s) or more | 2B(50A) | 1 1/4B(32A) | ||
MYR 249.53 | 1 Piece(s) | 9 Day(s) or more | 2B(50A) | 1 1/2B(40A) |
Loading...
| Connecting Shape | 90° Elbow | Connection Type | Screw⇔Screw Different Diameter | Material | Stainless Steel |
|---|---|---|---|---|---|
| Connection Thread Type M1 | Rc | Connection Thread Type M2 | Rc | Applicable Fluid | Water / Air / Steam / Oil |
| Type | Fitting | Max. Operating Pressure(MPa) | 2 | Surface Treatment | No |
| Divisions of Max. Operating Pressure | 2.0Mpa or Less | Interior Resin Lining | No |

ONDASEISAKUSYO
Standard Price : MYR 25.74-
Days to Ship : 5 Day(s) or more

ON INDUSTRIES
Standard Price : MYR 32.60-
Days to Ship : 4 Day(s) or more

YODOSHI
Standard Price : MYR 29.67-
Days to Ship : 4 Day(s) or more

INOC
Standard Price : MYR 28.15-
Days to Ship : 4 Day(s) or more

CK_KINZOKU
Standard Price : MYR 42.57-
Days to Ship : 4 Day(s) or more

![Drainage Piping Materials, ESLON DV Fitting [DV / DV Colored / DV Cocoa / Transparent DV] Socket (DS)](http://my.misumi-ec.com/linked/material/mech/SGU1/PHOTO/221004995024.jpg?$product_recommend_b$)
SEKISUI_
Standard Price : MYR 4.35-
Days to Ship : 5 Day(s) or more
How can we improve?
How can we improve?
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Customer Privacy Policy
Thank you for your cooperation.
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Please use the inquiry form.
Customer Privacy Policy