(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
[Features]
• JFE pipe fittings are produced at cutting-edge facilities with thorough quality control.
• Moreover, ring stamp PL fittings are coat-baked with powder epoxy resin on the inner and outer surfaces, excluding screws, using a special coating method, providing enhanced adhesiveness, corrosion resistance, etc.
• Can be used with a high level of reliability.
Japanese Only
| Part Number |
|---|
| CA-B-1 |
| CA-B-1/4 |
| CA-B-2 |
| CA-B-3 |
| CA-B-3/4 |
| CA-B-3/8 |
| CA-B-4 |
| CA-B-5 |
| CA-B-6 |
| CA-B-11/2 |
| CA-B-11/4 |
| CA-B-21/2 |
| CA-W-1 |
| CA-W-1/4 |
| CA-W-2 |
| CA-W-3 |
| CA-W-3/4 |
| CA-W-3/8 |
| CA-W-4 |
| CA-W-11/2 |
| CA-W-11/4 |
| CA-W-21/2 |
| Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Days to Ship | Nominal of Thread M1 | Surface Treatment |
|---|---|---|---|---|---|---|
MYR 23.48 | 1 Piece(s) | 8 Day(s) or more | 1B(25A) | No | ||
MYR 17.81 | 1 Piece(s) | 8 Day(s) or more | 1/4B(8A) | No | ||
MYR 53.10 | 1 Piece(s) | 8 Day(s) or more | 2B(50A) | No | ||
MYR 187.68 | 1 Piece(s) | 14 Day(s) or more | 3B(80A) | No | ||
MYR 18.93 | 1 Piece(s) | 8 Day(s) or more | 3/4B(20A) | No | ||
MYR 17.81 | 1 Piece(s) | 8 Day(s) or more | 3/8B(10A) | No | ||
MYR 187.68 | 1 Piece(s) | 14 Day(s) or more | 4B(100A) | No | ||
- | 1 Piece(s) | 8 Day(s) or more | 5B(125A) | No | ||
- | 1 Piece(s) | 8 Day(s) or more | 6B(150A) | No | ||
MYR 39.44 | 1 Piece(s) | 8 Day(s) or more | 1 1/2B(40A) | No | ||
MYR 34.10 | 1 Piece(s) | 8 Day(s) or more | 1 1/4B(32A) | No | ||
MYR 187.68 | 1 Piece(s) | 14 Day(s) or more | 2 1/2B(65A) | No | ||
MYR 15.80 | 1 Piece(s) | 8 Day(s) or more | 1B(25A) | Zinc Plating | ||
MYR 12.85 | 1 Piece(s) | 8 Day(s) or more | 1/4B(8A) | Zinc Plating | ||
MYR 30.92 | 1 Piece(s) | 9 Day(s) or more | 2B(50A) | Zinc Plating | ||
MYR 187.68 | 1 Piece(s) | 8 Day(s) or more | 3B(80A) | Zinc Plating | ||
MYR 13.44 | 1 Piece(s) | 8 Day(s) or more | 3/4B(20A) | Zinc Plating | ||
MYR 12.85 | 1 Piece(s) | 8 Day(s) or more | 3/8B(10A) | Zinc Plating | ||
MYR 187.68 | 1 Piece(s) | 14 Day(s) or more | 4B(100A) | Zinc Plating | ||
MYR 23.91 | 1 Piece(s) | 8 Day(s) or more | 1 1/2B(40A) | Zinc Plating | ||
MYR 21.20 | 1 Piece(s) | 8 Day(s) or more | 1 1/4B(32A) | Zinc Plating | ||
MYR 187.68 | 1 Piece(s) | 14 Day(s) or more | 2 1/2B(65A) | Zinc Plating |
Loading...
| Connecting Shape | Cap | Connection Type | Pitch (Terminal) | Material | Cast Iron |
|---|---|---|---|---|---|
| Connection Thread Type M1 | Rc | Applicable Fluid | Water / Air / Steam / Gas / Oil | Type | Fitting |
| Max. Operating Pressure(MPa) | 1 | Divisions of Max. Operating Pressure | 1.0Mpa or Less | Interior Resin Lining | No |
| Details of Max. Operating Pressure (Vapor/Air/Gas/Oil which is 300℃ or Less)(MPa) | 1.0 | Details of Max. Operating Pressure (Steady Flow which is 120℃ or Less)(MPa) | 2.5 |

JFEPIPEFITTING
Standard Price : MYR 8.21-
Days to Ship : 8 Day(s) or more

CK_KINZOKU
Standard Price : MYR 25.74-
Days to Ship : 4 Day(s) or more

JFEPIPEFITTING
Standard Price : MYR 16.69-
Days to Ship : 8 Day(s) or more

CK_KINZOKU
Standard Price : MYR 19.75-
Days to Ship : 7 Day(s) or more

CK_KINZOKU
Standard Price : MYR 34.60-
Days to Ship : 13 Day(s) or more

JFEPIPEFITTING
Days to Ship : 16 Day(s) or more

CK_KINZOKU
Standard Price : MYR 23.21-
Days to Ship : 7 Day(s) or more


JFEPIPEFITTING
Days to Ship : 13 Day(s) or more
How can we improve?
How can we improve?
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Customer Privacy Policy
Thank you for your cooperation.
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Please use the inquiry form.
Customer Privacy Policy