(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • [Notice] Japan & China Golden Week holidays will start from 29 April to 6 May 2026. Kindly expect longer response from suppliers and possible delivery delay due to high volume of shipments after holiday. Early order placement is recommended. More details
  • [Announcement] MISUMI Malaysia website new user interface. Clearer navigation, easy product search and more. Explore now! May contact us at (60) 3 7890 6399 for any inquiries.

Screw-In PL Fitting, Socket (PL-S-5)

Screw-In PL Fitting, Socket PL-S-5

[Features]
• JFE pipe fittings are produced at cutting-edge facilities with thorough quality control.
• Moreover, ring stamp PL fittings are coat-baked with powder epoxy resin on the inner and outer surfaces, excluding screws, using a special coating method, providing enhanced adhesiveness, corrosion resistance, etc.
• Can be used with a high level of reliability.

PDF

Japanese Only

Part Number

Configured Part Number is shown.

PL-S-5

 
Part Number
PL-S-5
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipNominal of Thread M1

-

1 Piece(s) 17 Day(s) or more 5B(125A)

Loading...

  1. 1

Basic Information

Connecting Shape Socket Connection Type Screw⇔Screw Same Diameter・Different Type Material Cast Iron
Connection Thread Type M1 Rc Applicable Fluid Water / Air Type Fitting
Max. Operating Pressure(MPa) 2.5 Surface Treatment Epoxy Resin Divisions of Max. Operating Pressure than 2.0Mpa
Interior Resin Lining Presence

Please check the type/dimensions/specifications of the part PL-S-5 in the Screw-In PL Fitting, Socket series.

Products like this...

Part Number
PL-S-1/2
PL-S-11/2
PL-S-11/4
PL-S-2
PL-S-21/2
PL-S-6
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipNominal of Thread M1

-

1 Piece(s) 16 Day(s) or more 1/2B(15A)

-

1 Piece(s) 16 Day(s) or more 1 1/2B(40A)

-

1 Piece(s) 16 Day(s) or more 1 1/4B(32A)

-

1 Piece(s) 16 Day(s) or more 2B(50A)

-

1 Piece(s) 17 Day(s) or more 2 1/2B(65A)

-

1 Piece(s) 17 Day(s) or more 6B(150A)

Additional Products in this Category

Customers Who Viewed This Item Also Viewed

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(60) 3 7890 6399
9:00am - 6:00pm (Monday - Friday)
9:00am - 1:00pm (Saturday)