(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Suitable as fitting for connecting water supply and hot water supply related equipment. For brazing, use MB solder M171G5, M171G1, M171GF and MB High Flux M171HC for copper pipe.
Japanese Only
Part Number
Configured Part Number is shown.
M150A-1/2X22.22
| Applicable Fluid | Water | Material | Phosphorous-deoxidized copper | Connection Type | Pipe⇔Screw, welding type |
|---|---|---|---|---|---|
| Type | Fitting | Material of Applicable Pipe | Copper | Connection Thread Type | G (Tapped) |
| Applicable Pipe Type | Copper Pipe (for Construction) | Connection Shape | Straight Pipe⇔Screw(Union/Socket/Adapter/Connector.etc) | Fitting type | Welding joint |
| Applicable Tube Size Type | Size for Copper Pipe construction |
Please check the type/dimensions/specifications of the part M150A-1/2X22.22 in the Copper Tube Fitting, Copper Tube Fitting for Hot Water Supply, Copper Tube Socket Adapter series.
| Part Number |
|---|
| M150A-1/2X9.52 |
| M150A-1X28.58 |
| M150A-3/4X22.22 |
| Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Days to Ship | Nominal A 1 | Nominal B 1 | Applicable Pipe O.D. 1 (mm) | Nominal of Thread |
|---|---|---|---|---|---|---|---|---|
MYR 31.80 | 1 Piece(s) | 9 Day(s) or more | 8 | 1/4 | 9.52 | 1/2B(15A) | ||
MYR 60.42 | 1 Piece(s) | 9 Day(s) or more | 25 | 1 | 28.58 | 1B(25A) | ||
MYR 28.76 | 1 Piece(s) | 5 Day(s) or more | 20 | 3/4 | 22.22 | 3/4B(20A) |

MIYAKO
Standard Price : MYR 42.53-
Days to Ship : 9 Day(s) or more

MIYAKO
Standard Price : MYR 95.36-
Days to Ship : 9 Day(s) or more

MIYAKO
Standard Price : MYR 47.00-
Days to Ship : 9 Day(s) or more

MIYAKO
Standard Price : MYR 24.63-
Days to Ship : 5 Day(s) or more

MIYAKO
Standard Price : MYR 41.58
Days to Ship : 5 Day(s) or more

MIYAKO
Standard Price : MYR 8.34-
Days to Ship : 2 Day(s) or more

TOYO FITTING
Standard Price : MYR 122.74-
Days to Ship : 14 Day(s) or more

MIYAKO
Standard Price : MYR 16.01-
Days to Ship : 5 Day(s) or more

MIYAKO
Standard Price : MYR 18.63
Days to Ship : 5 Day(s) or more

MIYAKO
Standard Price : MYR 30.36-
Days to Ship : 5 Day(s) or more

MIYAKO
Standard Price : MYR 82.79-
Days to Ship : 9 Day(s) or more
How can we improve?
How can we improve?
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Customer Privacy Policy
Thank you for your cooperation.
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Please use the inquiry form.
Customer Privacy Policy