(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
[Features]
・ As It is made of stainless steel, it has excellent corrosion resistance and beautiful external appearance, and is sanitary. No need to worry about rust bumps, no need for painting or plating
・ Cast products are made of high strength stainless steel SCS13A, manufactured by lost wax precision casting, and subjected to heat treatment to pickling. As a result, the structure is fine and stable, and it has high strength and can be used with confidence. Also, the surface skin is fine and beautiful, and the dimensional accuracy is sufficient.
Japanese Only
Part Number
Configured Part Number is shown.
SCS13A-T-2B
| Connecting Shape | Tee | Connection Type | Screw⇔Screw Same Diameter・Different Type | Material | SCS13A |
|---|---|---|---|---|---|
| Connection Thread Type M1 | Rc | Applicable Fluid | Water / Air / Steam / Gas / Oil | Type | Fitting |
| Surface Treatment | No | Interior Resin Lining | No |
Please check the type/dimensions/specifications of the part SCS13A-T-2B in the Stainless Steel Screw-In Pipe Fitting, Tee [T] series.
| Part Number |
|---|
| SCS13A-T-1/8B |
| SCS13A-T-11/2B |
| SCS13A-T-11/4B |
| SCS13A-T-1B |
| SCS13A-T-3/4B |
| SCS13A-T-3/8B |
| Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Days to Ship | Nominal of Thread M1 |
|---|---|---|---|---|---|
MYR 27.71 | 1 Piece(s) | 7 Day(s) or more | 1/8B(6A) | ||
MYR 119.85 | 1 Piece(s) | 7 Day(s) or more | 1 1/2B(40A) | ||
MYR 103.60 | 1 Piece(s) | 7 Day(s) or more | 1 1/4B(32A) | ||
MYR 69.67 | 1 Piece(s) | 6 Day(s) or more | 1B(25A) | ||
MYR 48.83 | 1 Piece(s) | 8 Day(s) or more | 3/4B(20A) | ||
MYR 29.82 | 1 Piece(s) | 5 Day(s) or more | 3/8B(10A) |

ON INDUSTRIES
Standard Price : MYR 31.34-
Days to Ship : 4 Day(s) or more

ONDASEISAKUSYO
Standard Price : MYR 26.73-
Days to Ship : 5 Day(s) or more
![Stainless Steel Screw-In Pipe Fittings, Reducing Tee [TR]](http://my.misumi-ec.com/linked/material/mech/MIE1/PHOTO/221000768523_001.jpg?$product_recommend_b$)
MIETECHNO
Standard Price : MYR 36.97-
Days to Ship : 5 Day(s) or more

YODOSHI
Standard Price : MYR 22.18-
Days to Ship : 4 Day(s) or more

NAGOYA
Standard Price : MYR 50.68-
Days to Ship : 10 Day(s) or more

KOGANEI
Standard Price : MYR 2,048.93-
Days to Ship : 4 Day(s) or more
![Stainless Steel Screw-In Pipe Fitting, Union [U]](http://my.misumi-ec.com/linked/material/mech/MIE1/PHOTO/221000768545_001.jpg?$product_recommend_b$)
MIETECHNO
Standard Price : MYR 55.22-
Days to Ship : 7 Day(s) or more
![Stainless Steel, Screw-In Tube Fitting, Hexagonal Nipple [SN]](http://my.misumi-ec.com/linked/material/mech/MIE1/PHOTO/221000768668_001.jpg?$product_recommend_b$)
MIETECHNO
Standard Price : MYR 15.98-
Days to Ship : 5 Day(s) or more

CK_KINZOKU
Standard Price : MYR 40.85
Days to Ship : 13 Day(s) or more

NAGOYA
Standard Price : MYR 50.68-
Days to Ship : 7 Day(s) or more
How can we improve?
How can we improve?
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Customer Privacy Policy
Thank you for your cooperation.
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Please use the inquiry form.
Customer Privacy Policy