(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
The LA Coupling Series fittings are structured to seal fluids by crimping the rubber packing to the pipes.
Japanese Only
| Part Number |
|---|
| LA-NT-1/2B-N-C |
| LA-NT-1/2B-N-W |
| LA-NT-1B-N-C |
| LA-NT-1B-N-W |
| LA-NT-2B-N-C |
| LA-NT-2B-N-W |
| LA-NT-3/4B-N-C |
| LA-NT-3/4B-N-W |
| LA-NT-11/2B-N-C |
| LA-NT-11/2B-N-W |
| LA-NT-11/4B-N-C |
| LA-NT-11/4B-N-W |
| Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Days to Ship | Material of Applicable Pipe | Nominal A 1 | Nominal B 1 | Applicable Pipe O.D. 1 (mm) | Surface Treatment | Operating Temperature Range (°C) |
|---|---|---|---|---|---|---|---|---|---|---|
MYR 91.43 | 1 Piece(s) | 11 Day(s) or more | Steel pipe / PVC Pipe | 15 | 1/2 | 21.7 | Commercial Coated Article (Epoxy Resin) (End-C) | -10~40 | ||
MYR 82.65 | 1 Piece(s) | 11 Day(s) or more | Steel pipe / PVC Pipe | 15 | 1/2 | 21.7 | White Products (Zinc Plated)(The End-W) | -10~60 | ||
MYR 169.92 | 1 Piece(s) | 11 Day(s) or more | Steel pipe | 25 | 1 | 34 | Commercial Coated Article (Epoxy Resin) (End-C) | -10~40 | ||
MYR 151.78 | 1 Piece(s) | 11 Day(s) or more | Steel pipe | 25 | 1 | 34 | White Products (Zinc Plated)(The End-W) | -10~60 | ||
MYR 362.11 | 1 Piece(s) | 11 Day(s) or more | Steel pipe / PVC Pipe | 50 | 2 | 60.5 | Commercial Coated Article (Epoxy Resin) (End-C) | -10~40 | ||
MYR 308.69 | 1 Piece(s) | 11 Day(s) or more | Steel pipe / PVC Pipe | 50 | 2 | 60.5 | White Products (Zinc Plated)(The End-W) | -10~60 | ||
MYR 122.07 | 1 Piece(s) | 11 Day(s) or more | Steel pipe / PVC Pipe | 20 | 3/4 | 27.2 | Commercial Coated Article (Epoxy Resin) (End-C) | -10~40 | ||
MYR 109.07 | 1 Piece(s) | 11 Day(s) or more | Steel pipe / PVC Pipe | 20 | 3/4 | 27.2 | White Products (Zinc Plated)(The End-W) | -10~60 | ||
MYR 252.05 | 1 Piece(s) | 11 Day(s) or more | Steel pipe / PVC Pipe | 40 | 1 1/2 | 48.6 | Commercial Coated Article (Epoxy Resin) (End-C) | -10~40 | ||
MYR 219.55 | 1 Piece(s) | 11 Day(s) or more | Steel pipe / PVC Pipe | 40 | 1 1/2 | 48.6 | White Products (Zinc Plated)(The End-W) | -10~60 | ||
MYR 210.77 | 1 Piece(s) | 11 Day(s) or more | Steel pipe | 32 | 1 1/4 | 42.7 | Commercial Coated Article (Epoxy Resin) (End-C) | -10~40 | ||
MYR 186.13 | 1 Piece(s) | 11 Day(s) or more | Steel pipe | 32 | 1 1/4 | 42.7 | White Products (Zinc Plated)(The End-W) | -10~60 |
Loading...
| Applicable Fluid | Water / Air / Gas / Chemical / Oil | Material | Black heart malleable cast iron | Connection Type | Pipe⇔Pipe, same diameters, plug-in type |
|---|---|---|---|---|---|
| Type | Fitting | Max. Operating Pressure(MPa) | 1 | Applicable Pipe Type | Steel pipe (general) |
| Connection Shape | Tee | Fitting type | Mechanical Joint | Applicable Tube Size Type | Steel pipe JIS size |
| Divisions of Max. Operating Pressure(MPa) | 1.0Mpa or Less | Rubber Gasket Material | NBR |
How can we improve?
How can we improve?
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Customer Privacy Policy
Thank you for your cooperation.
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Please use the inquiry form.
Customer Privacy Policy