(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
The LA coupling series consists of fittings designed to seal fluid with the rubber gasket press-fit onto the pipe.
Japanese Only
| Part Number |
|---|
| LA-SSS-1/2B-N-C |
| LA-SSS-1/2B-N-W |
| LA-SSS-1B-N-C |
| LA-SSS-1B-N-W |
| LA-SSS-2B-N-C |
| LA-SSS-2B-N-W |
| LA-SSS-3/4B-N-C |
| LA-SSS-3/4B-N-W |
| LA-SSS-11/2B-N-C |
| LA-SSS-11/2B-N-W |
| LA-SSS-11/4B-N-C |
| LA-SSS-11/4B-N-W |
| Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Days to Ship | Material of Applicable Pipe | Nominal A 1 | Nominal B 1 | Applicable Pipe O.D. 1 (mm) | Surface Treatment | Operating Temperature Range (°C) |
|---|---|---|---|---|---|---|---|---|---|---|
MYR 61.73 | 1 Piece(s) | 11 Day(s) or more | Steel pipe / PVC Pipe | 15 | 1/2 | 21.7 | Commercial Coated Article (Epoxy Resin) (End-C) | -10~40 | ||
MYR 53.87 | 1 Piece(s) | 11 Day(s) or more | Steel pipe / PVC Pipe | 15 | 1/2 | 21.7 | White Products (Zinc Plated)(The End-W) | -10~60 | ||
MYR 121.65 | 1 Piece(s) | 11 Day(s) or more | Steel pipe | 25 | 1 | 34 | Commercial Coated Article (Epoxy Resin) (End-C) | -10~40 | ||
MYR 97.00 | 1 Piece(s) | 11 Day(s) or more | Steel pipe | 25 | 1 | 34 | White Products (Zinc Plated)(The End-W) | -10~60 | ||
MYR 207.99 | 1 Piece(s) | 11 Day(s) or more | Steel pipe / PVC Pipe | 50 | 2 | 60.5 | Commercial Coated Article (Epoxy Resin) (End-C) | -10~40 | ||
MYR 194.49 | 1 Piece(s) | 11 Day(s) or more | Steel pipe / PVC Pipe | 50 | 2 | 60.5 | White Products (Zinc Plated)(The End-W) | -10~60 | ||
MYR 82.65 | 1 Piece(s) | 11 Day(s) or more | Steel pipe / PVC Pipe | 20 | 3/4 | 27.2 | Commercial Coated Article (Epoxy Resin) (End-C) | -10~40 | ||
MYR 71.93 | 1 Piece(s) | 11 Day(s) or more | Steel pipe / PVC Pipe | 20 | 3/4 | 27.2 | White Products (Zinc Plated)(The End-W) | -10~60 | ||
MYR 181.07 | 1 Piece(s) | 11 Day(s) or more | Steel pipe / PVC Pipe | 40 | 1 1/2 | 48.6 | Commercial Coated Article (Epoxy Resin) (End-C) | -10~40 | ||
MYR 154.14 | 1 Piece(s) | 11 Day(s) or more | Steel pipe / PVC Pipe | 40 | 1 1/2 | 48.6 | White Products (Zinc Plated)(The End-W) | -10~60 | ||
MYR 136.50 | 1 Piece(s) | 11 Day(s) or more | Steel pipe | 32 | 1 1/4 | 42.7 | Commercial Coated Article (Epoxy Resin) (End-C) | -10~40 | ||
MYR 117.93 | 1 Piece(s) | 11 Day(s) or more | Steel pipe | 32 | 1 1/4 | 42.7 | White Products (Zinc Plated)(The End-W) | -10~60 |
Loading...
| Applicable Fluid | Water / Air / Gas / Chemical / Oil | Material | Black heart malleable cast iron | Connection Type | Pipe⇔Pipe, same diameters, plug-in type |
|---|---|---|---|---|---|
| Type | Fitting | Max. Operating Pressure(MPa) | 1 | Applicable Pipe Type | Steel pipe (general) |
| Connection Shape | Straight Pipe⇔Screw(Union/Socket/Reducer.etc) | Fitting type | Mechanical Joint | Applicable Tube Size Type | Steel pipe JIS size |
| Divisions of Max. Operating Pressure(MPa) | 1.0Mpa or Less | Rubber Gasket Material | NBR |
How can we improve?
How can we improve?
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Customer Privacy Policy
Thank you for your cooperation.
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Please use the inquiry form.
Customer Privacy Policy