(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Roller band for thermal expansion/contraction pipes
[Features]
· Roller band for thermal expansion/contraction pipes.
· For the A type, the L fixture has an electrogalvanized finish and the roller balls are made of cast iron.
· The B type has a guide attached to the placement roller (A type).
· The guide fixture and the L fixture are electrogalvanized.
· The roller balls are made of cast iron.
· The C type is a type A roller.
· Product capable of at least 200 A.
· The band has an electrogalvanized finish, and the roller balls are made of cast iron.
· The D type can have a guide attached after installing the pipe.
· Accurate setting of the marked position is possible via use of a center mark.
· Zinc electroplating finish
Japanese Only
| Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Days to Ship | Main fit tube(or application tube)outside diameter (mm) | The size of diameter of steel pipe (A) | Nominal Diameter (B) | Compatible Pipe Outer Diameter (mm) | Specifications | Hole pitch P (mm) |
|---|---|---|---|---|---|---|---|---|---|---|
MYR 21.31 | 1 Piece(s) | 7 Day(s) or more | 30~Less than 40 | 25A | 1 | 34 | No | 113 | ||
MYR 24.85 | 1 Piece(s) | 9 Day(s) or more | 40~Less than 50 | 40A | 1 1/2 | 48.6 | No | 132 | ||
MYR 79.23 | 1 Piece(s) | 12 Day(s) or more | 100~Less than 200 | 125A | 5 | 139.8 | No | 240 | ||
MYR 83.10 | 1 Piece(s) | 12 Day(s) or more | 100~Less than 200 | 150A | 6 | 165.2 | No | 270 | ||
MYR 137.15 | 1 Piece(s) | 12 Day(s) or more | 200~Less than 300 | 200A | 8 | 216.3 | No | 336 | ||
MYR 28.87 | 1 Piece(s) | 9 Day(s) or more | 20~Less than 30 | 20A | 3/4 | 27.2 | Guided | 107 | ||
MYR 30.17 | 1 Piece(s) | 9 Day(s) or more | 30~Less than 40 | 25A | 1 | 34 | Guided | 113 | ||
MYR 32.08 | 1 Piece(s) | 9 Day(s) or more | 40~Less than 50 | 32A | 1 1/4 | 42.7 | Guided | 122 | ||
MYR 36.34 | 1 Piece(s) | 9 Day(s) or more | 40~Less than 50 | 40A | 1 1/2 | 48.6 | Guided | 132 | ||
MYR 39.16 | 1 Piece(s) | 9 Day(s) or more | 60~Less than 70 | 50A | 2 | 60.5 | Guided | 142 | ||
MYR 47.75 | 1 Piece(s) | 9 Day(s) or more | 70~Less than 80 | 65A | 2 1/2 | 76.3 | Guided | 165 | ||
MYR 60.12 | 1 Piece(s) | 9 Day(s) or more | 80~Less than 90 | 80A | 3 | 89.1 | Guided | 177 | ||
MYR 84.23 | 1 Piece(s) | 9 Day(s) or more | 100~Less than 200 | 100A | 4 | 114.3 | Guided | 212 | ||
MYR 120.02 | 1 Piece(s) | 9 Day(s) or more | 100~Less than 200 | 125A | 5 | 139.8 | Guided | 240 | ||
MYR 136.48 | 1 Piece(s) | 9 Day(s) or more | 100~Less than 200 | 150A | 6 | 165.2 | Guided | 270 | ||
MYR 214.03 | 1 Piece(s) | 13 Day(s) or more | 200~Less than 300 | 200A | 8 | 216.3 | Guided | 336 | ||
MYR 49.95 | 1 Piece(s) | 9 Day(s) or more | 30~Less than 40 | 20A and 25A | 3/4・1 | 27.2/34 | No | 89 | ||
MYR 63.72 | 1 Piece(s) | 9 Day(s) or more | 40~Less than 50 | 32A・40A | 1 1/4·1 1/2 | 42.7/48.6 | No | 109 | ||
MYR 68.38 | 1 Piece(s) | 9 Day(s) or more | 60~Less than 70 | 50A | 2 | 60.5 | No | 117 | ||
MYR 102.42 | 1 Piece(s) | 9 Day(s) or more | 70~Less than 80 | 65A | 2 1/2 | 76.3 | No | 142 | ||
MYR 118.94 | 1 Piece(s) | 9 Day(s) or more | 80~Less than 90 | 80A | 3 | 89.1 | No | 154 | ||
MYR 139.00 | 1 Piece(s) | 9 Day(s) or more | 100~Less than 200 | 100A | 4 | 114.3 | No | 189 | ||
MYR 238.75 | 1 Piece(s) | 9 Day(s) or more | 100~Less than 200 | 125A | 5 | 139.8 | No | 215 | ||
MYR 283.81 | 1 Piece(s) | 9 Day(s) or more | 100~Less than 200 | 150A | 6 | 165.2 | No | 254 |
Loading...
| Type | Roller Band | Material | Steel | Applicable Tube Type | Heat-shrink Floor Piping |
|---|---|---|---|---|---|
| Surface Treatment | Electrolytic Zinc Plating | Qty.(piece) | 1 |


SYOWA_CP
Standard Price : MYR 61.95-
Days to Ship : 9 Day(s) or more

AKAGI
Standard Price : MYR 25.62-
Days to Ship : 7 Day(s) or more

SYOWA_CP
Standard Price : MYR 32.31-
Days to Ship : 8 Day(s) or more



AKAGI
Standard Price : MYR 34.89-
Days to Ship : 7 Day(s) or more

AKAGI
Standard Price : MYR 33.76-
Days to Ship : 4 Day(s) or more


SYOWA_CP
Standard Price : MYR 53.93-
Days to Ship : 9 Day(s) or more

AKAGI
Standard Price : MYR 20.96-
Days to Ship : 5 Day(s) or more

How can we improve?
How can we improve?
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Customer Privacy Policy
Thank you for your cooperation.
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Please use the inquiry form.
Customer Privacy Policy