(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • [Notice] Japan & China Golden Week holidays will start from 29 April to 6 May 2026. Kindly expect longer response from suppliers and possible delivery delay due to high volume of shipments after holiday. Early order placement is recommended. More details
  • [Announcement] MISUMI Malaysia website new user interface. Clearer navigation, easy product search and more. Explore now! May contact us at (60) 3 7890 6399 for any inquiries.

Riser Clamp, Riser Clamp / CL Riser Clamp (Electrogalvanized / Stainless Steel)

Riser Clamp, Riser Clamp / CL Riser Clamp (Electrogalvanized / Stainless Steel)

Dedicated floor band for SGP pipe, stainless steel pipe, surface coated steel pipe, copper pipe, cast iron drainage pipe, and fire resistant dual pipe (FDP),
Floor Band for SGP pipe (vibration proof auxiliary)

[Features]
· A10408 floor band: floor band for SGP pipe, electrogalvanized finish.
· A10423 stainless steel floor band: floor band for stainless steel copper pipe.
· A10410CL floor band: floor band for surface coated steel pipe, electrogalvanized finish.

(i)Caution

  • Some of the items are scheduled to be discontinued as of end of March in 2023. The manufacturer keep the items produced but they are not available with Misumi.
    There are not the replacement items and the plan to resumption of sale. Please check the quotation and order screen for details.

PDF

Japanese Only

Part Number

Configured Part Number is shown.

 
Part Number
A10408-0038
A10410-0021
A10410-0036
A10423-0034
A10424-0031
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipMain fit tube(or application tube)outside diameter
(mm)
Compatible Pipe Type Material Surface Treatment The size of diameter of steel pipe (A) Nominal Diameter (B) Compatible Pipe Outer Diameter
(mm)

MYR 7.72

1 Piece(s) 6 Day(s) or more 30~Less than 40[Steel Tubes / Coated Steel Tubes] SGP PipeSteelElectrolytic Zinc Plating25A134

MYR 22.97

1 Piece(s) 9 Day(s) or more 30~Less than 40[Steel Tubes / Coated Steel Tubes] Outer Surface Coated Steel PipeSteelElectrolytic Zinc Plating20A-31.2

MYR 24.27

1 Piece(s) 9 Day(s) or more 30~Less than 40[Steel Tubes / Coated Steel Tubes] Outer Surface Coated Steel PipeSteelElectrolytic Zinc Plating25A-37.6

MYR 80.51

1 Piece(s) 6 Day(s) or more 30~Less than 40Stainless Steel PipeStainless SteelNo25A134

MYR 110.68

1 Piece(s) 22 Day(s) or more 30~Less than 40[Steel Tubes / Coated Steel Tubes] Outer Surface Coated Steel PipeStainless SteelNo25A137.6

Loading...

  1. 1

Basic Information

Type Floor Band Qty.(piece) 1

Additional Products in this Category

Customers Who Viewed This Item Also Viewed

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(60) 3 7890 6399
9:00am - 6:00pm (Monday - Friday)
9:00am - 1:00pm (Saturday)