(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • [Announcement] MISUMI Malaysia website new user interface. Clearer navigation, easy product search and more. Explore now! May contact us at (60) 3 7890 6399 for any inquiries.

[Clean & Pack]Nut Brackets for Lead Screws

[Clean & Pack]Nut Brackets for Lead Screws

Three types of cleaning methods are available: degreasing, precision cleaning, and electrolytic polishing + precision cleaning. They can be ordered from one piece with the standard part number.
This eliminates the need for customer cleaning or outsourced cleaning, reducing the amount of time and effort required.
■Part Number for Clean & Pack Products
·Degreasing (Anti-rust single packing)     : Part Number SL-□□
·Precision cleaning (Degassing double packing)     : Part Number SH-□□
·Electrolytic polishing + precision cleaning (Degassing double packing) : Part Number SHD-□□
Product Part Number Cleaning Method Packaging Type Effects Compared to Uncleaned Product Environment (Standard) Process
SL-□□ Degreasing Anti-rust packing Oil removal General environment Regular assembly process
Post battery assembly process
SH-□□ Precision cleaning Degassing double packing Oil removal
Dust removal
Clean environment (Class 10 to 1,000) Battery assembly process
LCD-related post-assembly process
In-vehicle camera assembly process
SHD-□□ Electrolytic polishing + precision cleaning Degassing double packing Oil removal
Dust removal
Outgas reduction
Vacuum environment
Clean environment (Class 10 to 1,000)
Pre-semiconductor process
Liquid crystal deposition process
Pre-OLED process
■Notes
Cleaning also removes rust prevention oil, which may make the product more susceptible to rusting than an uncleaned product.
Please be careful about the application location and storage environment.

Please use Nut Bracket combined with Round Flanged Lead Screw Nut and Square Flanged Lead Screw Nut.

(i)Caution

  • Cleaning also removes rust prevention oil, which may make the product more susceptible to rusting than an uncleaned product.
    Please be careful about the application location and storage environment.
  • Steel products are now available.
Type[M] Material[S] Surface TreatmentCleaning Method
Cleaning MethodCleaning EnvironmentPackaging TypePacking Environment
SL-DNBAAluminum AlloyClear AnodizeDegreasingGeneral environmentAnti-rust packingGeneral environment
SH-DNBAPrecision cleaningClass 1,000Degassing double packingClass 10
SL-DNBMS45C EquivalentElectroless Nickel PlatingDegreasingGeneral environmentAnti-rust packingGeneral environment
SH-DNBMPrecision cleaningClass 1,000Degassing double packingClass 10
[ ! ] Products are packed by order quantity. Ex. If the order is for 20 pieces, they are packed in one package (incl. 20 pieces).
[ ! ] See the details of degreasing, precision cleaning, and electrolytic polishing shown at the bottom of the specifications table.

Specification Table

Part NumberH
SL-DNBA31550
Part NumberHABP.C.D.M1 × ℓD1L23M2 × ℓApplicable Nut
TypeNo.MTS□R, MTSFL
SL-DNBA
SH-DNBA

SL-DNBM
SH-DNBM
26420 25  30  40       40H+2026M4 × 7203024612M4 × 810
315 2325  30  40       50H+2331M5 × 7223530814M5 × 1012·14
386   27 30 35   50    60H+2738M6 × 1028453418M6 × 1216
426    2930 3540  50    65H+29423250392318·20
476      323540  50    70H+32473650463022·25
588        40 4550  60 80H+4058M8 × 1244604832M8 × 1628·32
668         434550  60 86H+43665265523636
7610           5055 6070100H+5076M10 × 145875601040M10 × 2040
8510             586070116H+58856885705050
[ ! ] Please use Nut Bracket combined with Round Flanged Lead Screw Nut and Square Flanged Lead Screw Nut.


Alterations

Part NumberH(HC)
SL-DNBA26425HC22.5
 
AlterationCodeSpec.
HCH Dimension
0.1 mm Increments
Ordering Code
HC22.5
No.H
26420.0 to 40.0
31523.0 to 40.0
38627.0 to 50.0
42629.0 to 50.0
47632.0 to 50.0
58840.0 to 60.0
66843.0 to 60.0
761050.0 to 70.0
851058.0 to 70.0

Cleaning Process

· Degreasing (Part Number: SL-□□)

* Stainless steel products may be used with alkaline hot pure water. There is no change in cleanliness.
* If the surface treatment is low-temperature black chrome plating, IPA cleaning will be applied.

Working Environment: General environment


Hydrocarbon cleaning Ro water cleaning
Neutral Detergent Cleaning

High-pressure jet washing (Ro water) followed by pure water cleaning

Oil-free Compressor Used

Anti-rust single packing
· Precision cleaning (Part Number: SH-□□)
 

Working Environment: Class 1,000

 

Working Environment: Class 10


Hydrocarbon cleaning Ro water cleaning
Neutral Detergent Cleaning

High-pressure jet washing (Ro water) followed by pure water (10 MΩ·cm) cleaning

Use pure water (13 MΩ·cm)

Use nitrogen blow

Conducted on a clean bench in a Class 10 clean environment
· Electrolytic polishing + precision cleaning (Part Number: SHD-□□)
 

Working Environment: Class 1,000

 

Working Environment: Class 10


Hydrocarbon cleaning
Ro water cleaning
Neutral Detergent Cleaning

Electrolytic polishing with an electrolytic polishing layer according to the material

High-pressure jet washing (Ro water) followed by pure water (10 MΩ·cm) cleaning

Use warm pure water (13 MΩ·cm)

Use nitrogen blow

Conducted on a clean bench in a Class 10 clean environment
Packaging Example
For degreasing:
(Part Number: SL-□□)

For precision cleaning or electrolytic polishing + precision cleaning:

(Part Number: SH-□□/SHD-□□) 
 For austenitic stainless steel and aluminum materialsFor iron and martensitic stainless steel materials
Depending on some products and sizes,
packaging type may vary.
[ ! ] Both the first and second layer packaging are degassed.[ ! ] A desiccant is included as an anti-rust measure.
There is one desiccant per package.
 
Cleaning Effectiveness / Recommended Environment for Use

Cleaning Method

Product Part Number

Packaging Type

Effects Compared to Uncleaned Product

Environment (Standard)

Use Case and Process

DegreasingSL-□□Anti-rust packingOil removalGeneral environmentRegular assembly process
Post battery assembly process
Precision cleaningSH-□□Degassing double packingOil removal
Dust removal
Clean environment (Class 10 to 1,000)Battery assembly process
LCD-related post assembly process
In-vehicle camera assembly process
Electrolytic polishing + precision cleaningSHD-□□Degassing double packingOil removal
Dust removal
Outgas reduction
Vacuum environment
Clean environment (Class 10 to 1,000)
Pre-semiconductor process
Liquid crystal deposition process
Pre-OLED process

Part Number 

CAD Data download and 3D preview are not available because the part number has not yet been determined.

  • *In order to open the CAD Data download and 3D preview screen, the part number must be fixed.
  • Please confirm the part number from "Specification / Dimension"on the left side, and then perform the CAD Data Download / 3D Preview operation.
Loading...
Part Number
SH-DNBA264-[20,​25,​30,​40]
SH-DNBA315-[23,​25,​30,​40]
SH-DNBA386-[27,​30,​35,​50]
SH-DNBA426-[29,​30,​35,​40,​50]
SH-DNBA476-[32,​35,​40,​50]
SH-DNBA588-[40,​45,​50,​60]
SH-DNBA668-[43,​45,​50,​60]
SH-DNBA7610-[50,​55,​60,​70]
SH-DNBA8510-[58,​60,​70]
SH-DNBM264-[20,​25,​30,​40]
SH-DNBM315-[23,​25,​30,​40]
SH-DNBM386-[27,​30,​35,​50]
SH-DNBM426-[29,​30,​35,​40,​50]
SH-DNBM476-[32,​35,​40,​50]
SH-DNBM588-[40,​45,​50,​60]
SH-DNBM668-[43,​45,​50,​60]
SH-DNBM7610-[50,​55,​60,​70]
SH-DNBM8510-[58,​60,​70]
SL-DNBA264-[20,​25,​30,​40]
SL-DNBA315-[23,​25,​30,​40]
SL-DNBA386-[27,​30,​35,​50]
SL-DNBA426-[29,​30,​35,​40,​50]
SL-DNBA476-[32,​35,​40,​50]
SL-DNBA588-[40,​45,​50,​60]
SL-DNBA668-[43,​45,​50,​60]
SL-DNBA7610-[50,​55,​60,​70]
SL-DNBA8510-[58,​60,​70]
SL-DNBM264-[20,​25,​30,​40]
SL-DNBM315-[23,​25,​30,​40]
SL-DNBM386-[27,​30,​35,​50]
SL-DNBM426-[29,​30,​35,​40,​50]
SL-DNBM476-[32,​35,​40,​50]
SL-DNBM588-[40,​45,​50,​60]
SL-DNBM668-[43,​45,​50,​60]
SL-DNBM7610-[50,​55,​60,​70]
SL-DNBM8510-[58,​60,​70]
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipMaterial Cleaning Method Surface Treatment No. (P.C.D) H
(mm)

-

1 Piece(s) 6 Day(s) or more [Aluminum] Aluminum AlloyPrecision CleaningClear Anodize264(26)20 ~ 40

-

1 Piece(s) 6 Day(s) or more [Aluminum] Aluminum AlloyPrecision CleaningClear Anodize315(31)23 ~ 40

-

1 Piece(s) 6 Day(s) or more [Aluminum] Aluminum AlloyPrecision CleaningClear Anodize386(38)27 ~ 50

-

1 Piece(s) 6 Day(s) or more [Aluminum] Aluminum AlloyPrecision CleaningClear Anodize426(42)29 ~ 50

-

1 Piece(s) 6 Day(s) or more [Aluminum] Aluminum AlloyPrecision CleaningClear Anodize476(47)32 ~ 50

-

1 Piece(s) 6 Day(s) or more [Aluminum] Aluminum AlloyPrecision CleaningClear Anodize588(58)40 ~ 60

-

1 Piece(s) 6 Day(s) or more [Aluminum] Aluminum AlloyPrecision CleaningClear Anodize668(66)43 ~ 60

-

1 Piece(s) 6 Day(s) or more [Aluminum] Aluminum AlloyPrecision CleaningClear Anodize7610(76)50 ~ 70

-

1 Piece(s) 6 Day(s) or more [Aluminum] Aluminum AlloyPrecision CleaningClear Anodize8510(85)58 ~ 70

-

1 Piece(s) 6 Day(s) [Steel] S45C EquivalentPrecision CleaningElectroless Nickel Plating264(26)20 ~ 40

-

1 Piece(s) 6 Day(s) [Steel] S45C EquivalentPrecision CleaningElectroless Nickel Plating315(31)23 ~ 40

-

1 Piece(s) 6 Day(s) [Steel] S45C EquivalentPrecision CleaningElectroless Nickel Plating386(38)27 ~ 50

-

1 Piece(s) 6 Day(s) [Steel] S45C EquivalentPrecision CleaningElectroless Nickel Plating426(42)29 ~ 50

-

1 Piece(s) 6 Day(s) [Steel] S45C EquivalentPrecision CleaningElectroless Nickel Plating476(47)32 ~ 50

-

1 Piece(s) 6 Day(s) [Steel] S45C EquivalentPrecision CleaningElectroless Nickel Plating588(58)40 ~ 60

-

1 Piece(s) 6 Day(s) [Steel] S45C EquivalentPrecision CleaningElectroless Nickel Plating668(66)43 ~ 60

-

1 Piece(s) 6 Day(s) [Steel] S45C EquivalentPrecision CleaningElectroless Nickel Plating7610(76)50 ~ 70

-

1 Piece(s) 6 Day(s) [Steel] S45C EquivalentPrecision CleaningElectroless Nickel Plating8510(85)58 ~ 70

-

1 Piece(s) 6 Day(s) or more [Aluminum] Aluminum AlloyDegreasingClear Anodize264(26)20 ~ 40

-

1 Piece(s) 6 Day(s) or more [Aluminum] Aluminum AlloyDegreasingClear Anodize315(31)23 ~ 40

-

1 Piece(s) 6 Day(s) or more [Aluminum] Aluminum AlloyDegreasingClear Anodize386(38)27 ~ 50

-

1 Piece(s) 6 Day(s) or more [Aluminum] Aluminum AlloyDegreasingClear Anodize426(42)29 ~ 50

-

1 Piece(s) 6 Day(s) or more [Aluminum] Aluminum AlloyDegreasingClear Anodize476(47)32 ~ 50

-

1 Piece(s) 6 Day(s) or more [Aluminum] Aluminum AlloyDegreasingClear Anodize588(58)40 ~ 60

-

1 Piece(s) 6 Day(s) or more [Aluminum] Aluminum AlloyDegreasingClear Anodize668(66)43 ~ 60

-

1 Piece(s) 6 Day(s) or more [Aluminum] Aluminum AlloyDegreasingClear Anodize7610(76)50 ~ 70

-

1 Piece(s) 6 Day(s) or more [Aluminum] Aluminum AlloyDegreasingClear Anodize8510(85)58 ~ 70

-

1 Piece(s) 6 Day(s) [Steel] S45C EquivalentDegreasingElectroless Nickel Plating264(26)20 ~ 40

-

1 Piece(s) 6 Day(s) [Steel] S45C EquivalentDegreasingElectroless Nickel Plating315(31)23 ~ 40

-

1 Piece(s) 6 Day(s) [Steel] S45C EquivalentDegreasingElectroless Nickel Plating386(38)27 ~ 50

-

1 Piece(s) 6 Day(s) [Steel] S45C EquivalentDegreasingElectroless Nickel Plating426(42)29 ~ 50

-

1 Piece(s) 6 Day(s) [Steel] S45C EquivalentDegreasingElectroless Nickel Plating476(47)32 ~ 50

-

1 Piece(s) 6 Day(s) [Steel] S45C EquivalentDegreasingElectroless Nickel Plating588(58)40 ~ 60

-

1 Piece(s) 6 Day(s) [Steel] S45C EquivalentDegreasingElectroless Nickel Plating668(66)43 ~ 60

-

1 Piece(s) 6 Day(s) [Steel] S45C EquivalentDegreasingElectroless Nickel Plating7610(76)50 ~ 70

-

1 Piece(s) 6 Day(s) [Steel] S45C EquivalentDegreasingElectroless Nickel Plating8510(85)58 ~ 70

Loading...

  1. 1

App. Example

Basic Information

Type Nut Bracket

Additional Products in this Category

Tech Support